NAMEOWNERGENERAL CONTRACTORCONTRACT AMOUNTCOMPLETION DATEOWN FORCES 
10255 RICHMONDDUROTECHDurotech $11,250.00Oct-2000100% 
1213 HERMANN SUSITE 380TRANS WSTERN MUSEUM MED TOWERC-AIR-S Mechanical $18,061.00Feb-201273% 
12605 EAST FWY-JIM ADLERJim AdlerMD Construction$15,841.00Dec-201368% 
411 LOVETTPOINT SECUREB. Bell Builders$118,225.00May-200696% 
4300 SCOTLANDWATER HILL COMPANIESWATER HILL COMPANIES$6,311.00Jul-200780% 
4300 SCOTLANDWATERHILL GROUPWATERHILL GROUP$137,403.00Aug-200854% 
5110 BUFFALO SPEEDWAYBUFFALO WESTPARK LTD.Higbie Ventures$79,700.00Dec-200384% 
701 JEFFERSONBROOK FIELD PROPERTIESC-AIR-S Mechanical $151,011.00Apr-200799% 
738 HIGHWAY 6 10TH FLOORGILLETT PROPERTIESC-AIR-S Mechanical $294,862.00Nov-1997100% 
7400 Suite 900MD Anderson Cancer CenterC-AIR-S Mechanical $36,210.00May-201288% 
801 TRAVIS COOLING TOWERROBERTSON STEPHENS COMMERCIAL PROPERTY FUNDC-AIR-S Mechanical $134,972.00Jun-1997100% 
AHSLEY FURNITURE KATYFINGERS FURNITUREArco National Construction$55,652.00May-200871% 
AIR STATION HOUSTONUS COAST GUARDWFI SOUTHWEST L.P.$25,691.00May-200799% 
AIRTEXAIRTEXVENTURE MECHANICAL$63,285.00Dec-200971% 
Aldine Escamilla Elem.ALDINE ISDALDINE ISD$1,323,152.00Jul-2009100% 
ALDINE ISD AIRLINE ELEMENTARYALDINE ISDC-AIR-S Mechanical $1,137,729.00May-200369% 
ALICE JOHNSON JR HIGHChannel View ISDFROST CONSTRUCTORS$87,414.00Dec-2004100% 
ALICE JOHNSON JR HIGHChannel View ISDFROST CONSTRUCTION$543,194.00Aug-200671% 
ALIEF CHANCELLOR ELEMENTARYAlief Independent School DistrictSterling Structures$172,782.00Nov-200775% 
ALIEF CLASSROOM PH 2Alief Independent School DistrictSterling Structures$568,057.00Jan-200799% 
ALIEF CLASSROOM PH1Alief Independent School DistrictSterling Structures$593,607.00Dec-2005100% 
ALIEF ELEMENTARYAlief Independent School DistrictBRAE BURN CONSTRUCTION$1,472,256.00Dec-200782% 
ALIEF IDS- YOUENS ELEMENTARYAlief Independent School DistrictBLN ENGINEERING$693,468.00Oct-200535% 
ALIEF ISD CUMMINGSAlief Independent School DistrictC-AIR-S Mechanical $244,648.00Oct-199995% 
ALIEF SCHOOLSAlief Independent School DistrictC-AIR-S Mechanical $513,113.00Nov-1997100% 
ALIEF-HOLUBAlief Independent School DistrictC-AIR-S Mechanical $73,940.00Aug-1999100% 
APEX 3939APEXHigbie Ventures$19,185.00Sep-201084% 
AQUASOURCEAQUASOURCEDurotech $560,181.00Aug-1999100% 
AQUASOURSE EXPANSIONAQUASOURCEDurotech $119,559.00Aug-2000100% 
ARDMORE WATER FACILITYCity of HoustonPARALLAX$281,430.00Dec-1997100% 
ASHLEY FURNITURE LEAGUE CITYASHLEY FURNITUREArco National Construction$11,155.00Sep-200979% 
ASHLEY FURNITURE PASADENAFINGERS FURNITUREArco National Construction$54,892.00May-200867% 
ASHLEY FURNITURE PEARLANDFINGERS FURNITUREArco National Construction$65,688.00Jun-200864% 
AT&T AIRLINE BLUE BELLAT&THC Beck$10,013.00Oct-200883% 
AT&T AIRLINE CHILLERAT&THC Beck$267,597.00Jul-201294% 
AT&T ANGELTONAT&TBeck-Ford Construction$42,516.00Mar-200788% 
AT&T BARKER CHILLERAT&THC Beck$399,476.00Aug-200887% 
AT&T BEAUMONT CT DEMOAT&THC Beck$24,880.00Dec-201345% 
AT&T COLUMBUSAT&THC Beck$56,880.00May-200788% 
AT&T ELLINGTON DUCT MODSAT&THC Beck$13,166.00Nov-201498% 
AT&T EVAPORCOOL 2010 C-AIR-S Mechanical $140,984.00   
AT&T EVAPORCOOL 2011 C-AIR-S Mechanical $110,115.00   
AT&T EVAPORCOOL 2012 C-AIR-S Mechanical $45,094.00Dec-2012100% 
AT&T FAIRBANKS CHILLERAT&THC Beck$659,616.00Feb-200992% 
AT&T GARTH ROADAT&THigbie Ventures$18,354.00Jul-200952% 
AT&T GREENSPOINT CHILLERAT&THC Beck$333,698.00Mar-2014  
AT&T GREENWOOD DUCT MODSAT&THC Beck$18,794.00Nov-201498% 
AT&T HOLLISTER CHILLERAT&TAT&T HOLLISTER$62,718.00Feb-200864% 
AT&T HOODSAT&THC Beck$12,378.00Sep-200996% 
AT&T IDLEWOOD POWER ROOMAT&THC Beck$42,430.00Dec-201384% 
AT&T JEFFERSONAT&THC Beck$2,115,578.00Oct-201377% 
AT&T JEFFERSON 11TH FLOORAT&THC Beck$405,314.00Dec-201092% 
AT&T Jefferson 2nd FloorAT&THC Beck$1,013,921.00Dec-201460% 
AT&T JEFFERSON 3RD FLOORAT&THC Beck$409,240.00Feb-200983% 
AT&T JEFFERSON 3RD FLOORAT&THC Beck$15,673.00Oct-2007100% 
AT&T JEFFERSON 8TH FLOORAT&THC Beck$18,502.00Jun-2012100% 
AT&T JEFFERSON CHILLERAT&THC Beck$558,014.00Jun-200996% 
AT&T JEFFERSON CNT ROOMAT&THC Beck$15,442.00Jun-201272% 
AT&T JEFFERSON DEMOAT&THC Beck$62,559.00Jun-200874% 
AT&T JEFFERSON DUCT MODSAT&THC Beck$49,211.00Jun-2013100% 
AT&T JEFFERSON GENERATORAT&THC Beck$50,509.00Oct-201098% 
AT&T JEFFERSON INSULATIONAT&THC Beck$37,273.00Nov-201015% 
AT&T KLEIN POWER ROOMAT&THC Beck$40,527.00Dec-201389% 
AT&T KOUNTZ WALL MOUNTAT&THC Beck$12,187.00Oct-2013100% 
AT&T LANGHAM CREEKAT&THC Beck$383,064.00Sep-200888% 
AT&T LAPORTEAT&THC Beck$81,789.00Feb-200890% 
AT&T MADISONVILLE LEGACYAT&THC Beck$12,146.00Dec-2013100% 
AT&T MauricevilleAT&THC Beck$15,238.00Mar-201497% 
AT&T MOTOR REPLACEMENTAT&TBritain Electric$282,378.00Jun-2013  
AT&T NATIONAL AHUAT&THC Beck$64,162.00Apr-200987% 
AT&T NEDERLAND ROOF REPLAT&THC Beck$39,299.00Sep-201456% 
AT&T PARK WEST 4TH FLOORAT&THC Beck$7,436.00Feb-2012100% 
AT&T PARK WEST BATTERYAT&THC Beck$23,773.00Feb-201230% 
AT&T PARK WEST CHILLERAT&THC Beck$261,001.00May-200971% 
AT&T PARK WEST GENERATORAT&THC Beck$46,199.00Apr-201258% 
AT&T PARK WEST VHOAT&THC Beck$203,058.00Jul-200880% 
AT&T PARKWEST LVL2 SHEAT&THC Beck$107,767.00Sep-200971% 
AT&T PARKWEST LVL2 SHELLAT&THC Beck$107,767.00Sep-200971% 
AT&T PARKWEST VHO CHILLERAT&THC Beck$1,234,982.00Nov-201084% 
AT&T PRESCOTTAT&THC Beck$278,961.00Feb-200889% 
AT&T PRESIDIO FD UPGRADEAT&THC Beck$54,885.00Aug-201296% 
AT&T PRESIDIO FIRST FLOORAT&THC Beck$18,611.00Feb-200874% 
AT&T Presidio Uverse 3rdAT&THC Beck$85,905.00Sep-201486% 
AT&T REPUBLICAT&TSOUTHWESTERN BELL TELEPHONE$68,541.00Feb-200785% 
AT&T REPUBLIC 2AT&THC Beck$99,361.00Oct-200764% 
AT&T SERVICE PROJECTSAT&TC-AIR-S Mechanical $663,934.00Jun-201373% 
AT&T SHERWOODAT&THC Beck$196,149.00Aug-200987% 
AT&T SOUTH SPRING CHILLERAT&THC Beck$326,315.00Feb-201289% 
AT&T UNDERWOODAT&TENCO$26,030.00Feb-200853% 
AT&T VICTOR WALL MOUNTSAT&THC Beck$24,460.00Nov-2014100% 
AT&T WESLAYAN 12TH FLOORAT&THC Beck$10,375.00Sep-201090% 
AT&T WESLAYAN 2ND FLOORAT&THC Beck$522,247.00Aug-201282% 
AT&T WESLAYAN CTAT&THC Beck$24,187.00Feb-201278% 
AT&T WESLAYAN CT & BOILERAT&THC Beck$1,571,005.00Feb-201478% 
AT&T WESLAYAN FAN COILAT&THC Beck$16,440.00Apr-200971% 
BAKER 6TH GRADE LAPORTELa Porte ISDSterling Structures$1,430,654.00Mar-200890% 
BANK OF TEXAS BELLAIREBANK OF TEXAS BELLAIREHC Beck$21,987.00Aug-200656% 
BANK OF TEXAS FONDRENBANK OF TEXAS FONDRENHC BECK$40,628.00Aug-200645% 
BANK OF TEXAS SUGARLANDBANK OF TEXASB. Bell Builders$20,074.00May-200785% 
BAYLOR BOILER PHASES II & IIIBaylor College of MedicineC-AIR-S Mechanical $258,865.00Jul-2002100% 
BAYLOR COLLEGE OF MEDICINE BOILER REPLACEMENTBaylor College of MedicineC-AIR-S Mechanical $503,748.00Sep-200261% 
BAYLOR COLLEGE OF MEDICINE DR GABBIANIBaylor College of MedicineVaughn Construction$39,929.00Oct-2000100% 
BAYOU CITY 10TH FLOORTenet Healthcare SystemsMAXWELL CONSTRUCTION$102,134.00Nov-1998100% 
BAYOU CITY 10TH FLOORTenet Healthcare SystemsMAXWELL CONSTRUCTION$102,134.00Nov-1998100% 
BAYOU CITY 11TH FLOORTenet Healthcare SystemsSHARMAN CONSTRUCTION$115,500.00May-200364% 
BAYOU CITY 12TH FLOORTenet Healthcare SystemsSHARMAN CONSTRUTION$109,500.00Jul-2002100% 
BAYOU CITY 17TH FLOORTenet Healthcare SystemsSHARMAN COSNTRUCTION$104,622.00Oct-2000100% 
BAYOU CITY 6TH FLOORTenet Healthcare SystemsSHARMAN CONSTRUCTION$130,150.00Jul-2001100% 
BAYOU CITY 7TH FLOORTenet Healthcare SystemsSHARMAN CONSTRUCTION$127,403.00Jul-2002100% 
BAYOU CITY 7TH FLOORTenet Healthcare SystemsC-AIR-S Mechanical $127,403.00Dec-200270% 
BAYOU CITY BOILER REPLACEMENTTenet Healthcare SystemsC-AIR-S Mechanical $58,842.00Nov-1998100% 
BAYOU CITY MRI EQUIPMENTTenet Healthcare SystemsBeck-Ford Construction$24,950.00Jun-2002100% 
BAYSIDE SURGICAL SUITECIRRUSBeck-Ford Construction$130,180.00Aug-2001100% 
BAYSIDE SURGICAL SUITE FIRE/ SMOKE DAMPERSBAYSIDE SURGICAL SUITESBeck-Ford Construction$10,401.00Jun-2002100% 
BAYTOWN CITY HALLCITY OF BAYTOWNC-AIR-S Mechanical $397,872.00Jun-1998100% 
BCM CNRC-FIRE DAMPERSBaylor College of MedicineC-AIR-S Mechanical $22,795.00Sep-200892% 
BEAUMONT MRIBEAUMONTBeck-Ford Construction$144,974.00Apr-201283% 
BEAUMONT POBBEAUMONT POBBeck-Ford Construction$195,762.00Feb-201170% 
BECK-FORD OFFICE Beck-Ford Construction$9,245.00   
BELMONT AREA PUMPCity of HoustonBRH GARVER$30,965.00Feb-1998100% 
BFD RESTAURANT Higbie Ventures$988.00Jun-2013100% 
BHP PETROLEUM LEVEL 2AMERICAS, INCTHE MAXWELL COMPANY$198,628.00Oct-199890% 
BIG LEAGUE KITCHEN RENOVATIONSLEAGUE CITYLinbeck Group$53,050.00Dec-200698% 
BIG THICKET FIRE FLOORBIG THICKETLEETEX CONSTRUCTION$83,992.00Feb-200989% 
BLEYL BOILER REPLACEMENTCY-FAIR ISDC-AIR-S Mechanical $69,813.00Jan-2000100% 
BLINN COLLEGEBLINN COLLEGEC-AIR-S Mechanical $221,202.00May-2002100% 
BOEING 5TH FLOOR OFFICE REOVATIONTHE BOEING CAMPANYThe Trevino Group$195,102.00Oct-200549% 
BOEING PASADENA REMODELTRIZEC PROPERTIES INC.The Trevino Group$117,944.00Dec-200495% 
BRAZORIA CITY MUSEUMCITY OF BRAZORIAZenith Construction$33,350.00Mar-201184% 
BRAZOSPORT COLLEGE BASFBrazosport CollegeDurotech $345,695.00Dec-200946% 
BRAZOSPORT COLLEGE C WINGBrazosport CollegeC-AIR-S Mechanical $415,305.00Mar-200790% 
BRAZOSPORT CVOR PACBrazosport CollegeVaughn Construction$10,173.00Sep-200991% 
Brazosport EVOR & PACUBrazosportH&G Builders$152,663.00Sep-200965% 
BUSH IAH ECONOMY PARKCity of HoustonTONETTI CONSTRUCTION$39,268.00Aug-2001100% 
BUSH IAH SCHLOTZSKYSCHLOTZSKYBRD, INC.$29,813.00Apr-200967% 
CACTUS BUILDERS OFFICECactus BuildersCactus Builders$13,000.00Jun-200752% 
CAI HANGER G, GROUND RADCONTINENTAL AIRLINESCONTINENTAL AIRLINES$53,124.00Dec-200993% 
CAI-CARGO BLDG. QUICKPAKCity of HoustonBFJ Construction$17,452.00Feb-201069% 
CAMP WAMPUMCamp WampumC-AIR-S Mechanical $169,179.00Feb-200881% 
CAMP WAMPUM COIL CO.Camp WampumC-AIR-S Mechanical $30,886.00Oct-200595% 
CAMP WAMPUM REF MONITORCamp WampumC-AIR-S Mechanical $27,915.00Sep-2008182% 
CAMP WAMPUM SERVER ACLOPEZ NEGRETTEC-AIR-S Mechanical $14,868.00Nov-200675% 
Camp Wampum Switch GearCamp WampumC-AIR-S Mechanical $8,395.00Oct-201356% 
CAMP WAMPUM TOWERCamp WampumC-AIR-S Mechanical $74,782.00Dec-200785% 
CAMPTON CONDOSCAMPTONFELD$26,466.00Aug-200981% 
CARLTON RESIDENCESTERLING BANKSTERLING BANK$25,410.00Oct-200599% 
CB RESTAURANT James Ray Architects$2,065.00   
CE KING HIGH SCHOOL PHASE VIISheldon ISDFROST CONSTRUCTORS$499,944.00May-200356% 
CENTRAL MALLCENTRAL MALLRay Scaggs Construction Co$66,491.00Sep-200694% 
CENTRAL MALLUNIT REPLACEMENTCENTRAL MALLWAY SERVICES$13,314.00Sep-200683% 
CFC Broadcast Suite DHM CONSTRUCTION$120,875.00Feb-201367% 
CHAMBERS COUNTY TOURISTCHAMBERS COUNTYSpawGlass$316,094.00Dec-201295% 
CHAMPION FOREST BAPTIST CHURCH BROADCAST SUITECHAMPION FOREST BAPTIST CHURCHDHM CONSTRUCTION$120,875.00Feb-201370% 
CHAMPION TECHNOLOGIESCHAMPION TECHNOLOGIESPOGUE CONTRACTING$14,996.00Dec-200285% 
CHARLES RIVER LABCHARLES RIVER LABORATORIESVaughn Construction$641,463.00Feb-200469% 
CHARLES RVR LAB DUCTMODCHARLES RIVER LABORATORIESVaughn Construction$84,595.00Aug-201024% 
CHARLIES RIVERS LABORATORYCHARLES RIVERS LABORATORYVaughn Construction$142,600.00Nov-1998100% 
CHELSEA AUTOCLAVECONTINENTAL AIRLINESCAI$12,989.00Oct-201041% 
CHELSEA BAKERY OVENSCity of HoustonBFJ Construction$15,254.00Oct-200876% 
CHELSEA CARTWASHCHELSEABFJ Construction$17,388.00Mar-200884% 
CHELSEA COLD RM/INTCity of HoustonBFJ Construction$459,598.00Sep-200942% 
CHELSEA DISH MACHINES T&MCity of HoustonBFJ Construction$14,171.00Nov-200896% 
CHELSEA DISHMACHINE 2&4City of HoustonBFJ Construction$23,930.00Dec-200888% 
CHELSEA HVAC RENOVATIONSCONTINENTAL AIRLINESBFJ Construction$405,839.00Mar-200882% 
CHELSEA INTERNATIONAL FOODSCity of HoustonCONTINENTAL AIRLINES$15,913.00Oct-200837% 
CHELSEA REFRIGERATIONUNITED AIRLINESCAI$487,274.00Apr-201277% 
CHELSEA REFRIGERATIONCONTINENTAL AIRLINESHarvey Builders$240,552.00Jan-200481% 
CHELSEA REFRIGERATIONCONTINENTAL AIRLINESHarvey Builders$263,534.00Aug-200564% 
CHELSEA-FINAL ASSEMBLYCONTINENTAL AIRLINESBFJ Construction$28,356.00Feb-20085% 
CHR SOLUTIONSCHREvolve Infrastructure$12,000.00Nov-2009100% 
CHRISTUS HEALTH 2707 NWLCHRISTUS HEALTHTriton Construction$89,810.00Aug-201363% 
CHRISTUS ST JOHN CT SCANChristus St. John HospitalTriton Construction$20,623.00Nov-200564% 
CHRISTUS ST. CATHERINE WOMENS IMAGINGCHRISTUS HOSPITAL SYSTEMSTriton Construction$28,160.00Jun-200847% 
Chung Mei Buddist TempleChung Mei Buddist TempleB. Bell Builders$75,450.00Apr-201374% 
CINCO RANCH PROF BUILDINGEXEL COMMERCIAL REAL ESTATEHigbie Ventures$16,730.00Jun-200767% 
CINCO RANCH PROF. BLDG #2EXCEL COMMERCIAL REAL ESTATEHigbie Ventures$20,675.00Apr-200889% 
CITATION OIL & GASCITATION OIL & GASSpawGlass$945,396.00Oct-200957% 
CITY OF ROSENBERGCity of RosenbergSiemens Building Technologies$153,848.00Jun-201085% 
CLEARLAKE MRIColumbia Healthcare SystemsBFJ Construction$31,765.00Feb-1998100% 
CLEVELAND CATH LABCLEVELAND REGIONAL HOSPITALBeck-Ford Construction$30,085.00Mar-1997100% 
CLRMC- 1ST FLOOR MODIFICATIONClear Lake Regional Medical CenterBFJ Construction$17,981.00Feb-2007100% 
CLRMC BREAST CENTERClear Lake Regional Medical CenterBFJ Construction$158,135.00Dec-200777% 
CLRMC KITCHENClear Lake Regional Medical CenterBFJ Construction$550,691.00May-200870% 
CLRMC PHARMACYHCABFJ Construction$193,993.00May-200861% 
CLRMC-PHYSICIANClear Lake Regional Medical CenterBFJ Construction$81,340.00Mar-200866% 
CNC MANUFACTURINGCNC MANUFACTURINGWAY SERVICES$31,857.00Feb-200744% 
CNPC MAKE LAB ACChina National Petroleum CoprBrewer Construction$74,300.00Sep-201495% 
CNRC CONFERENCE ROOMBaylor College of MedicineC-AIR-S Mechanical $14,623.00May-1999100% 
COH 611 WALKERCity of HoustonSchneider Electric$109,356.00May-201183% 
COH BUILDING VentsCity of HoustonAlpha Building Corporation$19,150.00Oct-200984% 
COH JIB LIBRARYCOHJE DUNN$185,631.00Jun-201268% 
COH JP MCGOVERN SPORTS/RCity of HoustonZenith Construction$191,474.00Dec-201191% 
COH METRO SERVICE CENTERCity of HoustonSIEMOR$147,891.00Aug-201090% 
COH PHS II MECHCity of HoustonSchneider Electric$2,940,765.00Dec-201289% 
COH-POLICE HQ/SEWPPCity of HoustonISRI CONSTRUCTION$860,762.00Dec-201153% 
COLLEGE OF THE MAINLAND DOMESTIC WATERCOLLEGE OF THE MAINLANDC-AIR-S Mechanical $48,391.00Apr-200295% 
COMERICA BANK SHENENDOAHCOMERICATURNER CONSTRUCTION$55,558.00Sep-200694% 
COMMUNITY FAMILY CENTERCOMMUNITY FAMILY CENTERC-AIR-S Mechanical $24,878.00Apr-200795% 
CONSUMERS LAB MODULE LCS Constructors$16,725.00Feb-2013100% 
CONTINENTAL MORALES BLDG.United AirlinesC-AIR-S Mechanical$1,463,662.00Dec-201466% 
CORE LABS AHUCore LaboratoriesHunton Trane$32,866.00Nov-201499% 
CORNERSTONE METHODISTCORNERSTONE UNITED METHODIST CHURCHNorthwinds Construction$81,636.00Dec-201086% 
CRMC- ANGIOGRAPHYConroe Regional Medical CenterBFJ Construction$23,274.00Sep-200663% 
CRMC OUT PA IMAGINGConroe Regional Medical CenterBFJ Construction$180,950.00Feb-2007100% 
CROSBY ISDCrosby ISDSterling Structures$672,526.00Jun-201274% 
CROSSROADS BAPTIST CHURCHCROSSROADS BAPTIST CHURCHMG&A$640,078.00Apr-200987% 
CSJ 2ND FLOOR LABChristus St. John HospitalTriton Construction$38,685.00Dec-201355% 
CSJ 3RD FLOOR NURSE STACHRISTUS HOSPITAL SYSTEMTriton Construction$11,227.00Feb-200980% 
CSJ 4TH FLOOR ISO ROOMSChristus St. John HospitalTriton Construction$34,156.00Jul-200947% 
CSJ 4TH FLOOR NURSES ST.Christus St. John HospitalTriton Construction$11,350.00Jul-200980% 
CSJ CONFRENCE ROOMChristus St. John HospitalTriton Construction$61,130.00Aug-2005100% 
CSJ ER EXPANSIONCHRISTUS HOSPITAL SYSTEMSTriton Construction$442,709.00Dec-200863% 
CSJ EXPANSIONChristus St. John HospitalTriton Construction$1,857,525.00Jun-200799% 
CSJ LAB EXPANSION 2ND LVLCHRISTUS HOSPITAL SYSTEMSTriton Construction$166,064.00Oct-200865% 
CSJ MOB CONCUSSION CENTERCHRISTUS HOSPITAL SYSTEMSTriton Construction$15,351.00Oct-200754% 
CSJ PHARMACY 2ND FLOORChristus St. John HospitalTriton Construction$148,127.00Dec-200966% 
CVS 6241 HARRISBURGCVSHigbie Ventures$19,670.00Dec-200985% 
CY FAIR ANNEXTenet Healthcare SystemsC-AIR-S Mechanical$11,248.00Dec-201398% 
CY FAIR CONDENSER PIPINGCY FAIR HOSPITALC-AIR-S Mechanical $17,306.00Oct-201095% 
CY FAIR CREDIT UNIONCY-FAIR ISDVaughn Construction$68,288.00Dec-200582% 
CY FAIR FAN COILCY FAIR HOSPITALC-AIR-S Mechanical $41,314.00Dec-200959% 
CY FAIR HBO RENOVATIONTenet Healthcare SystemsC-AIR-S Mechanical $46,480.00Jun-200795% 
CY FAIR HOSP HEAT PUMPCY FAIR HOSPITALC-AIR-S Mechanical $15,997.00Mar-200894% 
CY FAIR HOSPITAL PIPINGCY FAIR HOSPITALC-AIR-S Mechanical $44,828.00Jul-200952% 
CY FAIR HOSPITAL RTUCY FAIR HOSPITALCactus Builders$13,377.00Jul-200890% 
CY FAIR ICU REPAIRSTenet Healthcare SystemsRobins & Morton$7,865.00Dec-200651% 
CY FAIR LAB RENOVATION Spaw Maxwell$168,637.00   
CY FAIR MED EDTenet Healthcare SystemsRobins & Morton$1,253,992.00Sep-200634% 
CY FAIR MED OR PROJECTTenet Healthcare SystemsRobins & Morton$2,005,382.00Jun-200697% 
CY- FAIR NCCUCY-FAIRSPAWMAXWELL$535,892.00May-200946% 
CY FAIR PHARMACYCY FAIR HOSPITALSPAW MAXWELL$91,957.00Feb-200952% 
CY FAIR URGENT CARECY FAIR HOSPITALC-AIR-S Mechanical $9,651.00Apr-201063% 
CY FAIR VESTIBULE ACCY FAIR HOSPITALC-AIR-S Mechanical $16,203.00Feb-201089% 
CY FAIR WOMENCY FAIR HOSPITALC-AIR-S Mechanical $26,470.00Mar-201182% 
CY FAIR XRA7 ROOM HPCy-Fair HospitalC-AIR-S Mechanical$10,607.00Dec-201477% 
CY-FAIR 12 HEAT PUMPSCY FAIR HOSPITALC-AIR-S Mechanical $22,080.00Feb-201282% 
CY-FAIR BOILER AT FOOD PRODUCTION FACILITYCY-FAIR ISDC-AIR-S Mechanical $41,012.00Nov-2000100% 
CY-FAIR CHILLER REPLACEMENTCY-FAIRSPAW MAXWELL$148,844.00Jun-200810% 
CY-FAIR COMPUTER ROOMSCY-FAIR ISDC-AIR-S Mechanical $93,403.00Mar-1997100% 
CY-FAIR FEDERAL CREDIT UNIONCY-FAIRBRAUN & BUTLER$93,878.00Oct-200885% 
CY-FAIR HOSP HEAT PUMPCY-FAIR HOSPITALC-AIR-S Mechanical $15,997.00Mar-200894% 
CY-FAIR HOSPITAL Q&ACY-FAIR HOSPITALSPAW MAXWELL$10,673.00Aug-200850% 
CY-FAIR ICU RTU REPLACEMENTCY FAIR HOSPITALSiemens Building Technologies$44,136.00Sep-201154% 
CY-FAIR LAB RENOCY FAIR HOSPITALSpawGlass$159,250.00Dec-201266% 
CY-FAIR MED CHILLERCY FAIR HOSPITALC-AIR-S Mechanical $116,540.00Sep-201198% 
CY-FAIR MED ORTenet Healthcare SystemsRobins & Morton$2,005,382.00Jun-200653% 
CY-FAIR MEDICAL CENTER ICU EXPANSIONCY FAIR HOSPITALRobins & Morton$654,812.00Oct-200567% 
CY-FAIR PRO 12 HPSTenet Healthcare SystemsFast-Track Construction$84,303.00Mar-201497% 
CY-FAIR WOMAN'S CENTERCY-FAIR ISDSPAWMAXWELL$46,470.00Feb-201182% 
DEL RIO COURTHOUSEDEL RIO PROPERTIESDEL RIO PREPERTIES$219,441.00Sep-200769% 
DEL RIO TX 1ST FLOORDEL RIO PROPERTIESUNITED MECHANICAL$50,366.00Dec-200795% 
DENNIS TOOLSDENNIS TOOLSWAY SERVICE LTD.$14,800.00Jun-200887% 
DENTAL OFFICETHE DENIST @ GRAND PARKWAYSterling Structures$22,860.00Apr-200494% 
DEWALCH TECHNOLOGIES Higbie Ventures$6,471.00   
DIAGNOSTIC EYE CENTERDIAGNOSTIC EYE CENTERSouth Coast Construction$18,091.00Nov-2000100% 
DICKENSON CITY HALLCITY OF DICKENSONDurotech $556,834.00Mar-201056% 
DISD SILBERNAGEL ESDickenson ISDSterling Structures$1,141,745.00Dec-201181% 
Dorf Ketal Brewer Construction$46,800.00Apr-201497% 
DR TANGHERMANN HOSPITALMAXWELL CONSTRUCTION$22,953.00Oct-1998100% 
DR ZONG PING LOUBaylor College of MedicineHarvey Builders$26,116.00Oct-2001100% 
DR. HOSPITAL- NEW ICUDR. HOSPITALBeck-Ford Construction$10,837.00Mar-200474% 
Dr. Luna Higbie Ventures$195,550.00Dec-201390% 
DRAKE BUILDINGDRAKE BUILDINGSPAWMAXWELL$48,665.00Nov-1999100% 
DUGAN RESIDENCE LYDIA DUGAN$41,752.00   
EASTERN METALSEASTERN METALSDurotech $27,786.00Jul-2000100% 
EDGEWOOD DRAINS- T&MSpring Branch ISDWALTON ROOFING$4,309.00Sep-200372% 
ENGINEERED AIR BALANCEENGINEERED AIR BALANCEACCURATE AIR SYSTEMS$66,047.00Feb-201091% 
ENHANCED CHILD DEVELOPMENTGILBERTO & KATRINA GARCIAJACK RAUS$81,148.00Nov-1997100% 
EPE INDUSTRIESEPE INDUSTRIESCAMDEN CONSTRUCTION$467,731.00Dec-2001100% 
EPIPHANY OF THE LORDCATHOLIC DIOCESE OF GALVESTONFRETZ CONSTRUCTION$152,999.00Aug-2000100% 
ESTES TRUCK LINESESTES TRUCK LINESCHASE$145,458.00Dec-200777% 
EVONIK Consulting Evonik$15,800.00Sep-196723% 
EXPRESS JET RTUEXPRESS JETEXPRESS JET$39,706.00Jul-201096% 
EXXON REACTOREXXONLCS Constructors$27,207.00May-201278% 
EYE CENTER OF TEXASEYE CENTER OF TEXASTriton Construction$18,500.00Dec-200873% 
FBISD 3 ELEMENTARYFort Bend ISDPRIME$160,319.00Aug-201055% 
FBISD PROGRESSIVE SCHOOLFort Bend ISDSterling Structures$589,455.00Aug-201159% 
FIBERTOWN PHASE 2VERIZON WIRELESSEvolve Infrastructure$206,489.00Apr-201069% 
FIBERTOWN POD CFIBERTOWNDSA$38,518.00May-201294% 
FINGERS WDLDS CURBSFINGERS FURNITUREHigbie Ventures$11,930.00Jul-200985% 
FINGERS WILLOWBROOKFINGERS FURNITUREArco National Construction$132,307.00Feb-200868% 
FIRE STATION NO 12City of HoustonC-AIR-S Mechanical $27,233.00Jan-1998100% 
FIRST COLONY RESTROOMFIRST COLONY MALLRAM MECHANICAL$32,025.00May-200888% 
FLEMING ELEMENTARYFREEPORT ISDCONSTRUCTION LTD$559,905.00Feb-2000100% 
FOLEY BUILDINGFOLEY BUILDINGZenith Construction$14,183.00Aug-201199% 
FORT BEND ISD WAREHOUSEFORT BEND IDSMILLSTONE$41,431.00Nov-1997100% 
FRESH PAKFRESH PAKFRESH PAK$13,812.00Apr-2012100% 
Fresh Pak FreshPak$17,711.00May-2014100% 
FRIENDSWOOD CHURCHFRIENDSWOOD COMMUNITY CHURCHSterling Structures$372,686.00Mar-200482% 
FRIENDSWOOD CHURCH PH2FRIENDSWOOD COMMUNITY CHURCHSterling Structures$768,798.00Feb-200875% 
FUNKY CHICKEN Higbie Ventures$1,845.00Jun-2013100% 
FUSIONFUSIONC-AIR-S Mechanical $44,324.00Jun-1997100% 
FUSION ROOFFUSIONC-AIR-S Mechanical $15,490.00Aug-1997100% 
GALV COLLEGE CHEM LABGalveston CollegeVaughn Construction$29,529.00Nov-201471% 
GANDER MOUNTAINGANDER MOUNTAINTCI CONSTRUCTION$10,696.00Feb-201393% 
GANDER MOUNTAIN HEMPSTEADGANDER MOUNTAINVENTURE MECHANICAL$155,350.00Oct-200562% 
GANDER MOUNTAIN SUGARLANDGANDER MOUNTAINVENTURE MECHANICAL$132,846.00Aug-200599% 
GANDER MT LUBBOCKGANDER MOUNTAINVENTURE MECHANICAL$156,945.00Dec-200781% 
GANDER MT. COLLEGE STATIONGANDER MOUNTAINVENTURE MECHANICAL$187,550.00Aug-200774% 
GANDER MT. SUGARLANDGANDER MOUNTAINVENTURE MECHANICAL$132,846.00Oct-200576% 
GANDER MT. TEXARKANAGANDER MOUNTAINVENTURE MECHANICAL$168,084.00Jun-200681% 
GANDER MT. TYLERGANDER MOUNTAINVENTURE MECHANICAL$174,000.00Dec-200595% 
GATEWAY ACADEMYGATEWAY ACADEMYTEXTRON$29,645.00Jan-200797% 
GRAND MANAGEMENTGRAND MANAGEMENTArco National Construction$25,066.00Dec-200992% 
GREENSPOINT BC BLD A, B &DGREENSPPOINT BCVENTURE MECHANICAL$357,932.00Oct-200843% 
GROCERS VEHICLE EXHAGROCERS VEHICLEVaughn Construction$13,729.00May-2000100% 
GSA- REGION 7GSA-REGION 7Siemens Building Technologies$461,586.00Oct-201280% 
GTE STAFFORD EXCHANGEVERIZON, INCWTA & ASSOCIATES$118,446.00Oct-200095% 
GUINAN HALLTHE UNIVERSITY OF ST. THOMASC-AIR-S Mechanical $94,139.00Jan-2000100% 
GUINAN HALLTHE UNIVERSITY OF ST. THOMASC-AIR-S Mechanical $144,430.00Jan-2001100% 
GULF STATES LTACMEDICAL CENTERRobins & Morton$2,407,087.00Jul-201073% 
HAAK WINERYHaak WineryC-AIR-S Mechanical $38,776.00Oct-2000100% 
HAAK WINERY EXPANSIONHaak WineryC-AIR-S Mechanical $19,945.00Sep-2002100% 
HAAK WINERY PH3Haak WineryC-AIR-S Mechanical $17,690.00Dec-200594% 
Habitat for Humanity PDS Management Group$79,649.00Mar-201491% 
HAMPTON INN OST. OAHAMPTON INNGJ SHIN$84,791.00Jun-200770% 
HARDY MACHINEBPI REALTYBPI REALTY$21,951.00Feb-1997100% 
HARGRAVE ELECTRICHARGRAVE ELECTRICHARGRAVE ELECTRIC$10,375.00May-1999100% 
HASSIER ELEMENTARYKlein ISDCONSTRUCTION LTD$728,146.00Oct-1999100% 
HASSIER ELEMENTARY ADDITIONKlein ISDFIREMAN COSNTRUCTION$161,344.00Aug-2001100% 
HBU GALLERYHBU GALLERYDHM CONSTRUCTION$109,499.00Nov-201275% 
HCA BAY AREA ENDOSCOPYHCAC-AIR-S Mechanical$12,710.00Sep-2013100% 
HCC HEINEN BUILDINGHouston Community CollegeC-AIR-S Mechanical $39,682.00Jan-2000100% 
HCC TRUCK DRIVING SCHOOLHouston Community CollegeSRYMALLA CONSTRUCTION$172,681.00Sep-1999100% 
HCHD BEN TAUB GH PHARMACYHARRIS COUNTY HOSPITAL DISTRICTCentennial Contractors$156,006.00Mar-201461% 
HCHD LBJ 2C REFRESHHarris County Hospital DistrictCentennial Contractors$85,522.00Jun-20145% 
HCHD LBJ NUCLEAR MEDICINEHARRIS COUNTY HOSPITAL DISTRICTCentennial Contractors$35,555.00Mar-201469% 
HEALTHBRIDGE CHILDRENSHEALTHBRIDGERobins & Morton$487,778.00Jul-201075% 
HEIGHTS HOSPITAL CHILLERHeights HospitalBeck-Ford Construction$224,387.00Mar-1997100% 
HERMANN 2ND FLOOR MODMemorial Herman Hospital SysSPAWMAXWELL$90,397.00Aug-2001100% 
HERMANN CENTRAL STERLIEMemorial Herman Hospital SysSPAWMAXWELL$294,549.00Aug-200180% 
HERMANN ICU LEVEL 3Memorial Herman Hospital SysSPAWMAXWELL$114,419.00Sep-2001100% 
HERMANN LEVEL 3 SHELL SPACEMemorial Herman Hospital SysSPAWMAXWELL$69,745.00Sep-2001100% 
HERMANN MRIMemorial Herman Hospital SysSPAWMAXWELL$26,376.00Jan-2000100% 
HERMANN NEUROVASCULARMemorial Herman Hospital SysSPAWMAXWELL$71,297.00Aug-2001100% 
HERMANN NUCLEAR CAMERAMemorial Herman Hospital SysSPAWMAXWELL$17,431.00Oct-2001100% 
Hermann Park Lake PlazaPUBLIC WORKSVaughn Construction$232,961.00Dec-200975% 
HERMANN PROFESSIONAL BUILDING 2ND FLOORHERMANN HOSPITALTHE MAXWELL COMPANY$35,001.00Jun-1998100% 
HERMANN SOUTHWEST ADMINISTRATION RELOCATIONMemorial Herman Hospital SysSPAWMAXWELL$120,875.00Oct-200599% 
HERMANN SW 8TH FLOORMemorial Herman Hospital SysSPAWMAXWELL$18,390.00Dec-200443% 
HERMANN SW- ER & ACUTE CAREMemorial Herman Hospital SysSPAW MAXWELL$188,543.00Dec-2005100% 
HERMANN SW NICUMemorial Herman Hospital SysSPAWMAXWELL$605,662.00Oct-200360% 
HERMANN SW-NICUMemorial Herman Hospital SysSPAWMAXWELL$605,662.00Aug-200455% 
HERMANN- WOODLANDS CARDIOMemorial Herman Hospital SysSPAWMAXWELL$329,595.00Mar-2005100% 
HISD MARSHALL MS COH OCCHouston ISDCBIC CONSTRUCTION$46,530.00Feb-201137% 
HMB DINING/ CHILD ARTThe University of TexasThe Trevino Group$54,700.00Apr-1997100% 
HMB POSITRON CAMERAThe University of TexasSouth Coast Construction$11,254.00Jan-1997100% 
HNWM CT SCANHouston NW Medical CenterBeck-Ford Construction$23,264.00Jul-201292% 
HNWM SPRING URGENT CAREHouston NW Medical CenterBeck-Ford Construction$74,878.00Apr-201383% 
HNWMC- 6TH FLOORNE MEDICAL CENTERBeck-Ford Construction$67,324.00Feb-200958% 
HNWMC KLEINWOODHouston NW Medical CenterBeck-Ford Construction$28,168.00Aug-201275% 
HNWMC SLEEP LABHouston NW Medical CenterTriton Construction$41,285.00May-200470% 
HNWMC- TELEMETRY/TOWER 3Houston NW Medical CenterBeck-Ford Construction$302,057.00May-200873% 
HNWMC-OB OPSMD Anderson Cancer CenterHC Beck$14,324.00Oct-200871% 
HOBBY CTR CT REPAIR HOBBY CENTER$14,136.00   
HOBBY GENERATORHOBBY AIRPORT SYSTEMSEAS$14,210.00May-200878% 
HOBBY GENERATOR RW#4EASEAS$16,055.00Sep-200554% 
HOLCOMBE CROSSWALKThe University of TexasMINER DEDERICK$26,915.00Apr-1997100% 
HOLIDAY INN GALLERIAHOSPITAL MNGMNT. AVDISTORS, INC.WAY SERVICES$123,464.00Sep-200786% 
HOUSTON HOUSE BOILER REPAIRHOUSTON HOUSE APARTMENTSEPOXY DESIGN SYSTEMS$145,384.00Nov-200482% 
HOUSTON MIDWEST POLICECity of HoustonSpawGlass$334,902.00Jul-201080% 
HOUSTON NORTH WEST MEDICAL CENTER 4TH FLOORHouston NW Medical CenterRobins & Morton$1,210,522.00Dec-200732% 
HOUSTON NORTH WEST MEDICAL CENTER MRIHouston NW Medical CenterTriton Construction$26,505.00Jun-200784% 
HOUSTON NORTHWEST MEDICAL CENTERTenet Healthcare SystemsBarringer Construction$203,187.00Mar-200285% 
HOUSTON NORTHWEST MEDICAL CENTER CATH LAB RENOVTenet Healthcare SystemsBarringer Construction$38,756.00Dec-200277% 
HOUSTON NORTHWEST MEDICAL CENTER PEAKWOOD CTTenet Healthcare SystemsBeck-Ford Construction$34,323.00Dec-200280% 
HOUSTON NORTHWEST MEDICAL NEW OAHUTenet Healthcare SystemsC-AIR-S Mechanical $28,700.00Aug-200280% 
HOUSTON NORTHWEST MEDICAL SURGERY RENOVATIONSTenet Healthcare SystemsRobins & Morton$2,624,877.00Sep-200150% 
HOUSTON ZOO REPTILE HOUSECity of HoustonVaughn Construction$12,431.00Feb-2002100% 
HPB DR MCDOUGALMemorial Herman Hospital SysSPAWMAXWELL$27,701.00Jun-1999100% 
HPB DR. AGUILAR, SUITE 920HERMANN HOSPITALTHE MAXWELL COMPANY$144,240.00Oct-1998100% 
HUFFMAN MS BOILERHUFFMAN ISD3V COMPANY$37,586.00Aug-201086% 
HUNTON DISTRIBUTIONHUNTON DISTRIBUTIONHUNTON DISTRIBUTION$165,820.00Apr-200965% 
HUNTSMAN Turner Construction$188,652.00Nov-201452% 
IBERIA BANK - GREENWAY PLAIBERIA BANKLINCOLN BUILDERS$91,919.00Dec-201090% 
IBERIA BANK - MEMORIAL CITYIBERIA BANKLINCOLN BUILDERS$89,325.00Dec-201088% 
IBERIA BANK HOLCOMBEIBERIA BANKLINCOLN BUILDERS$59,901.00May-201184% 
IBERIA BANK SUGARLANDIBERIA BANKLinbeck Group$92,864.00Sep-201290% 
IBM 2 RIVERWAYIBMHC Beck$30,783.00Feb-2004100% 
IBM 9TH FLOOR RENO Skanska USA$44,170.00Jul-201435% 
INTERCARE COOLING TOWERINTERCAREBeck-Ford Construction$22,000.00Nov-1997100% 
INTERIM CRUISE TERMINALPORT OF HOUSTON AUTHORITYCONSTRUCTION LTD$146,078.00May-1997100% 
INWOOD PHARMACYINWOOD PHARMACYGREY HORSE$20,806.00Jun-200750% 
JAMES AVERY CRAFTSMANJAMES AVERY CRAFTSMANPOGUE CONSTRUCTION$25,356.00Apr-2002100% 
JAMES AVERY CRAFTSMANJAMES AVERY CRAFTSMANPOGUE CONTRACTING$25,356.00Jul-2002100% 
JAMES AVERY CRAFTSMAN MEMORIAL CITY MALLJAMES AVERY CRAFTSMANPOGUE CONTRACTING$25,356.00Jul-200275% 
JCI KINGWOOD COIL FIXESKINGWOOD HOSPITALJONCON$13,154.00Sep-201173% 
JONES PAVILION CODE UPGRADEHERMANN HOSPITALSPAWMAXWELL$178,151.00Jan-2000100% 
KATY MEMORIAL HERMANN CS FCUMemorial Herman Hospital SysC-AIR-S Mechanical $9,214.00Apr-200382% 
KATY TECHNOLOGYKaty ISDDATAVOX$10,100.00Nov-200987% 
KELLY STREET SERVICES CENTERCity of HoustonPYRAMID WATERPROOFING$83,371.00Sep-2001100% 
KENSINGER TENANT BUILD OUT Zenith Construction$21,519.00   
KLEIN 2003 RENOVATIONKlein ISDC-AIR-S Mechanical $1,509,652.00Nov-200356% 
KLEIN CENTRAL OFFICE HVAC RENOVATIONSKlein ISDC-AIR-S Mechanical $230,519.00May-1998100% 
KLEIN CENTRAL PLANTKlein ISDIDEAL CONSTRUCTION$41,637.00Sep-1998100% 
KLEIN COLLINS HIGH SCHOOLKlein ISDMARSHALL CONSTRUCTION$449,785.00May-2002100% 
KLEIN COLLINS HS ADDKlein ISDHULL & HULL$119,000.00Mar-2011100% 
KLEIN HIGH SCHOOLKlein ISDCONSTRUCTION LTD$104,982.00Jul-1999100% 
KLEIN HIGH SCHOOL RENOVATIONSKlein ISDDT CONSTRUCTION$54,298.00Oct-1997100% 
KLEIN INSTRUCTIONAL CENTERKlein ISDSHETTING CONSTRUCTION MANAGEMENT$53,554.00May-200380% 
KLEIN INTERMEDIATE NO 7 CONTROLSKlein ISDENCOMPASS$187,130.00Jul-2002100% 
KLEIN ISD 3 ELEMENTARY SCHOOLSKlein ISDHULL & HULL$242,472.00Sep-200292% 
KLEIN MISC. ADD & RENOKlein ISDHULL & HULL$20,476.00Dec-200490% 
KLEIN MISCELLANEOUS 1999Klein ISDMARSHALL CONSTRUCTION$408,514.00Oct-1999100% 
KLEIN OAK HIGH SCHOOLKlein ISDICI CONSTRUCTION$25,300.00Jul-1999100% 
KLEIN TEP/DAEP BLDGKlein ISDHULL & HULL$195,500.00Mar-2011100% 
KLEIN WAREHOUSE REMODELKlein ISDBeck-Ford Construction$46,947.00Feb-1997100% 
KLIEN GREENHOUSE PROJECTKlein ISDM SCOTT$10,900.00Apr-2008100% 
KOCH-GLITSCHKOCH-GLITSCHSPAWMAXWELL$123,638.00Sep-1999100% 
KRATOS DEFENSEKRATOS DEFENSEKRATOS DEFENSE$25,477.00Nov-201086% 
KTI STORAGE TANKKTIACI-CM, INC.$17,294.00Feb-200867% 
LA PORTE BAKER 6TH GRADE 2008La Porte ISDSterling Structures$273,468.00Jul-200965% 
LA PORTE LOMAX JHS REMOLa Porte ISDSterling Structures$230,015.00Feb-200968% 
LAKE HOUSTON PUMP STATIONCity of HoustonJJ CONTRACTING$80,493.00Jul-1999100% 
LAW OFFICE 1111 ROSALIEHILBURN SHORES & SHERER PLLCC-AIR-S Mechanical $78,191.00Dec-200593% 
LBJ STEAMLBJ HOSPITALHULL & HULL$26,194.00Nov-200482% 
LE PEEP SHEPHARDBILL SORENSENHIGBIE ROTH CONSTRUCTION$27,336.00Mar-1997100% 
LEAGUE CITY BIG LEAGUELEAGUE CITYKOCH-GLITSCH$157,433.00Dec-200577% 
LIQUI-BOXLIQUI-BOX CORPC-AIR-S Mechanical $66,063.00Sep-1999100% 
LOMAX JHS PH 2Clear Creek ISDSterling Structures$1,623,325.00Apr-201054% 
LOPEZ, NEGRETE COMMUNICATIONSLOPEZ NEGRETECECO CONSTRUCTION$180,498.00Dec-200553% 
LSCS GREENSPOINT CHILLERLone Star College SystemC-AIR-S Mechanical$362,684.00Oct-201374% 
LUTHERAN CH GALVESTONLUTHERAN CHURCHC-AIR-S Mechanical $104,486.00Dec-200278% 
LYNDON B JOHNSON BRONCHIOSCOPYHarris County Hospital DistrictC-AIR-S Mechanical $71,338.00Dec-1997100% 
LYONS EYE BANKBaylor College of MedicineMAXWELL CONSTRUCTION$17,294.00May-1999100% 
MAC - RTU REPLACEMENTMEMORIAL ATHLETHIC CLUBSterling Structures$31,502.00Nov-200976% 
MAGNOLIA LIBRARYMONTGOMERY COUNTYPARALLAX$39,284.00Dec-1997100% 
MAINLAND HOSPITAL- MRIColumbia Healthcare SystemsBFJ Construction$22,078.00Feb-1998100% 
MALVERN LABMALVERN LABLCS Constructors$66,785.00Jun-201283% 
MARKET STREET RECYCLINGMARKET STREET RECYCLINGVINTAGE CREATIONS$43,124.00Jul-200990% 
Mashburn ClothiersSid/Ann MashburnHigbie Ventures$62,605.00Apr-201498% 
MATAGORDA GENERAL HOSPITALMATAGORDA GENERAL HOSPITALGASKEY CONSTRUCTION$248,180.00Dec-1997100% 
MATTRESS FIRMMATTRESS FIRMHigbie Ventures$29,639.00Sep-200495% 
MAXIMUS COFFEEMAXIMUS COFFEEB. Bell Builders$90,194.00Jul-200985% 
MCCLANE FOOD SERVICESMCCLANE FOODSCONSTRUCTION MANAGEMENT TECHNO$101,613.00Oct-200593% 
MCHS ATHLETIC FIELDS RENKaty ISDSterling Structures$11,732.00Dec-200599% 
MD ANDERSON ACQSIM CT ROOMSMD Anderson Cancer CenterSouth Coast Construction$49,351.00Oct-2000100% 
MD ANDERSON ACQSIM CT SCANNERMD Anderson Cancer CenterVaughn Construction$100,001.00Mar-2002100% 
MD ANDERSON AHU LP 13.8MD Anderson Cancer CenterSouth Coast Construction$22,182.00Mar-2001100% 
MD ANDERSON ALKEK COYOTE DRIVEMD Anderson Cancer CenterSouth Coast Construction$135,164.00Jul-2001100% 
MD ANDERSON ALKEK LEVEL 5MD Anderson Cancer CenterVaughn Construction$135,164.00Jul-2001100% 
MD ANDERSON ANIMAL EXHAUSTMD Anderson Cancer CenterSouth Coast Construction$43,456.00May-1999100% 
MD ANDERSON ART CARDMD Anderson Cancer CenterSouth Coast Construction$10,878.00Nov-1998100% 
MD ANDERSON ATC PHARMACYMD Anderson Cancer CenterSouth Coast Construction$36,500.00Dec-1999100% 
MD ANDERSON ATC TRANSFUSIONMD Anderson Cancer CenterSouth Coast Construction$86,098.00Feb-2001100% 
MD ANDERSON B2 GU CLINICMD Anderson Cancer CenterSouth Coast Construction$40,160.00Oct-2000100% 
MD ANDERSON B4 LAB RENOVATIONSMD Anderson Cancer CenterSouth Coast Construction$54,521.00Sep-2001100% 
MD ANDERSON B7-Y7 FCUMD Anderson Cancer CenterSouth Coast Construction$16,419.00Nov-200285% 
MD ANDERSON BACKUP ANIMAL AHUMD Anderson Cancer CenterSouth Coast Construction$40,635.00Nov-2001100% 
MD ANDERSON BATES FREEMAN COILMD Anderson Cancer CenterSouth Coast Construction$468,410.00Jun-2002100% 
MD ANDERSON BATES FREEMAN FSDMD Anderson Cancer CenterC-AIR-S Mechanical $34,158.00Mar-2003100% 
MD ANDERSON BMT LABMD Anderson Cancer CenterSouth Coast Construction$141,689.00Mar-2000100% 
MD ANDERSON BRB VALVESMD Anderson Cancer CenterSouth Coast Construction$61,494.00Jul-2001100% 
MD ANDERSON BREAST CENTERMD Anderson Cancer CenterThe Trevino Group$101,091.00Nov-1997100% 
MD ANDERSON BREAST CENTERMD Anderson Cancer CenterSouth Coast Construction$10,549.00May-2000100% 
MD ANDERSON CAGE WASHMD Anderson Cancer CenterSouth Coast Construction$300,842.00Sep-2001100% 
MD ANDERSON CBN1 COIL RPLCMEMD Anderson Cancer CenterC-AIR-S Mechanical $94,285.00Jun-200387% 
MD ANDERSON CBN-4MD Anderson Cancer CenterSouth Coast Construction$29,557.00Sep-2000100% 
MD ANDERSON CC FACULTY OFFICE RADIOLOGYMD Anderson Cancer CenterVaughn Construction$14,628.00Nov-2001100% 
MD ANDERSON CENTRAL PLANT DEMOMD Anderson Cancer CenterSouth Coast Construction$369,432.00Feb-2001100% 
MD ANDERSON CFH UPGRADEMD Anderson Cancer CenterSouth Coast Construction$117,358.00Dec-2000100% 
MD ANDERSON CHILD & ADOLESCENTMD Anderson Cancer CenterSouth Coast Construction$350,751.00Apr-200356% 
MD ANDERSON CLARK CLINCIMD Anderson Cancer CenterSouth Coast Construction$339,538.00Nov-1998100% 
MD ANDERSON CLARK CLINCI SSMD Anderson Cancer CenterSouth Coast Construction$38,375.00May-2002100% 
MD ANDERSON COLLING TOWERMD Anderson Cancer CenterVaughn Construction$42,950.00Jan-2001100% 
MD ANDERSON CP PRV STATIONMD Anderson Cancer CenterSouth Coast Construction$15,738.00Oct-2001100% 
MD ANDERSON CT5MD Anderson Cancer CenterSouth Coast Construction$10,442.00Dec-1999100% 
MD ANDERSON DIAGNOSTIC FILM IMAGING LIBRARYMD Anderson Cancer CenterVaughn Construction$480,807.00Nov-2001100% 
MD ANDERSON DNA SEQUENCERMD Anderson Cancer CenterVaughn Construction$54,960.00Nov-2001100% 
MD ANDERSON EL RIO PHASES II & IIIMD Anderson Cancer CenterSouth Coast Construction$618,879.00Feb-200359% 
MD ANDERSON EPIDEMIOLOGYMD Anderson Cancer CenterSouth Coast Construction$11,222.00Sep-1999100% 
MD ANDERSON ETV TRANSLOGICMD Anderson Cancer CenterSouth Coast Construction$24,081.00Dec-1998100% 
MD ANDERSON FCU LAB Y6.5312MD Anderson Cancer CenterC-AIR-S Mechanical $19,427.00Dec-2001100% 
MD ANDERSON FLEX CENTERMD Anderson Cancer CenterSouth Coast Construction$348,629.00Sep-200285% 
MD ANDERSON G1/G2MD Anderson Cancer CenterSouth Coast Construction$207,000.00Aug-1999100% 
MD ANDERSON G11MD Anderson Cancer CenterSouth Coast Construction$19,875.00Dec-1999100% 
MD ANDERSON G8.3755 FCU INSTALLMD Anderson Cancer CenterC-AIR-S Mechanical $10,938.00Jan-2002100% 
MD ANDERSON HAWKEYEMD Anderson Cancer CenterSouth Coast Construction$20,911.00Jul-2002100% 
MD ANDERSON HEMAPATHOLOGYMD Anderson Cancer CenterSouth Coast Construction$129,848.00Nov-2001100% 
MD ANDERSON HEMATOLOGY 3, 4, 5, 6MD Anderson Cancer CenterSouth Coast Construction$104,435.00Nov-2000100% 
MD ANDERSON HEMATOLOGY LEVEL 8MD Anderson Cancer CenterSouth Coast Construction$17,039.00Dec-1999100% 
MD ANDERSON HERMATOLOGY IIIMD Anderson Cancer CenterSouth Coast Construction$23,361.00Sep-1999100% 
MD ANDERSON HMB 3.060MD Anderson Cancer CenterSouth Coast Construction$46,372.00Jan-2001100% 
MD ANDERSON INPATIENT FAMILY WAITINGMD Anderson Cancer CenterSouth Coast Construction$66,613.00Dec-1998100% 
MD ANDERSON LAB Y6.5306MD Anderson Cancer CenterSouth Coast Construction$22,974.00Apr-2002100% 
MD ANDERSON LINEAR ACCELERATORMD Anderson Cancer CenterSouth Coast Construction$58,856.00Nov-2000100% 
MD ANDERSON LP 10 WESTMD Anderson Cancer CenterSouth Coast Construction$20,276.00Nov-1999100% 
MD ANDERSON MOFLO LASERMD Anderson Cancer CenterSouth Coast Construction$35,257.00Jul-2000100% 
MD ANDERSON MOLECULAR ONCOLOGYMD Anderson Cancer CenterVaughn Construction$106,244.00Apr-2002100% 
MD ANDERSON NEUROLOGY PB2920MD Anderson Cancer CenterSouth Coast Construction$17,239.00Apr-1999100% 
MD ANDERSON NEW CLARK CLINCIMD Anderson Cancer CenterSouth Coast Construction$318,616.00Nov-2000100% 
MD ANDERSON P.E.T. NETPET NET PHARMACEUTICALS, INCVaughn Construction$56,981.00Apr-200390% 
MD ANDERSON R2 BLOOD LABMD Anderson Cancer CenterSouth Coast Construction$128,690.00Mar-2001100% 
MD ANDERSON R7 GI CLINICMD Anderson Cancer CenterSouth Coast Construction$40,491.00Oct-2000100% 
MD ANDERSON RESPIRATORY CAREMD Anderson Cancer CenterSouth Coast Construction$24,115.00Oct-1998100% 
MD ANDERSON SRB 1.426MD Anderson Cancer CenterSouth Coast Construction$17,299.00Jul-1999100% 
MD ANDERSON SRB 1.451MD Anderson Cancer CenterSouth Coast Construction$12,814.00Dec-1999100% 
MD ANDERSON SRB 1.470MD Anderson Cancer CenterSouth Coast Construction$54,461.00Dec-2000100% 
MD ANDERSON STERILIZERMD Anderson Cancer CenterSouth Coast Construction$46,026.00Jul-2000100% 
MD ANDERSON TAN AHU PREFILTERSMD Anderson Cancer CenterSouth Coast Construction$126,137.00Oct-1999100% 
MD ANDERSON TAN CONDENSATIONMD Anderson Cancer CenterSouth Coast Construction$128,690.00Mar-2001100% 
MD ANDERSON TAN HUMIDIFIERSMD Anderson Cancer CenterSouth Coast Construction$381,380.00Mar-2002100% 
MD ANDERSON TEMP TISSUE BANKMD Anderson Cancer CenterSouth Coast Construction$32,701.00Jun-2001100% 
MD ANDERSON TUMOR BIOLOGYMD Anderson Cancer CenterMINER DEDERICK$152,799.00Feb-1997100% 
MD ANDERSON VIBRATION ISOLATION SRBMD Anderson Cancer CenterSouth Coast Construction$15,449.00Mar-1998100% 
MD ANDERSON XRO TISSUEMD Anderson Cancer CenterSouth Coast Construction$38,416.00Feb-2002100% 
MD ANDERSON Y2 RADIATION PHYSICSMD Anderson Cancer CenterC-AIR-S Mechanical $48,805.00Dec-200260% 
MD ANDERSON Y-2 RADIATION PHYSICSMD Anderson Cancer CenterSouth Coast Construction$30,528.00Nov-1999100% 
MD ANDERSON Y2 RESTROOMSMD Anderson Cancer CenterSouth Coast Construction$13,000.00Feb-2002100% 
MD ANDERSON Y3 RADIATION ONCOLOGYMD Anderson Cancer CenterSouth Coast Construction$14,843.00Oct-2000100% 
MD ANDERSON Y3-Y8 TOILETSMD Anderson Cancer CenterSouth Coast Construction$16,271.00Dec-20051% 
MD ANDERSON Y4 AUTOPSYMD Anderson Cancer CenterSouth Coast Construction$60,824.00Nov-2001100% 
MD ANDERSON Y6 DERMATOLOGYMD Anderson Cancer CenterSouth Coast Construction$53,770.00Sep-2001100% 
MD ANDERSON Y6.6094 MOLECULAR GENETICSMD Anderson Cancer CenterSouth Coast Construction$7,803.00Aug-200285% 
MD ANDERSON Y7.5311 (3FCU)MD Anderson Cancer CenterSouth Coast Construction$15,724.00Feb-200385% 
MDA 02 PROJECTMD Anderson Cancer CenterC-AIR-S Mechanical $17,150.00Jun-200794% 
MDA 16IN KEYSTONE VAL#95MD Anderson Cancer CenterC-AIR-S Mechanical $27,502.00Mar-201094% 
MDA 1CC1 RENOVATIONMD Anderson Cancer CenterVaughn Construction$396,372.00Apr-200881% 
MDA 2SCRB 4.3320MD Anderson Cancer CenterCactus Builders$12,394.00Feb-201168% 
MDA 3SCRB2 OPTOACCOUSTICMD Anderson Cancer CenterCactus Builders$22,225.00Aug-201271% 
MDA 4N, 212S REPLACEMENTSMD Anderson Cancer CenterVaughn Construction$123,325.00Aug-200745% 
MDA 4SCRB HUDDLEMD Anderson Cancer CenterCactus Builders$98,567.00Feb-201349% 
MDA 4SCRB2 KALURI LABMD Anderson Cancer CenterCactus Builders$38,574.00Apr-201321% 
MDA 500HP VFDMD Anderson Cancer CenterJOHNSON CONTROLS, INC$71,792.00Feb-200960% 
MDA A&I MEDICINE # 15MD Anderson Cancer CenterCactus Builders$65,662.00Jul-201044% 
MDA AC8 PROVOST #74MD Anderson Cancer CenterCactus Builders$145,880.00Jun-201072% 
MDA ACB 4 CT RELOCATION Vaughn Construction$61,365.00Dec-2012  
MDA ACB 4 CT RELOCATIONMD Anderson Cancer CenterVaughn Construction$61,365.00Dec-201370% 
MDA ACB BLOOD DONORMD Anderson Cancer CenterSouth Coast Construction$13,193.00Jan-2007100% 
MDA ACB OAHU FAN REPAIRMD Anderson Cancer CenterCactus Builders$140,683.00Nov-201457% 
MDA ACB RADIATIONMD Anderson Cancer CenterThe Trevino Group$24,753.00Dec-201136% 
MDA ACB8 INFUSIONMD Anderson Cancer CenterCactus Builders$12,352.00Feb-201346% 
MDA ACUTECAREMD Anderson Cancer CenterVaughn Construction$56,400.00Sep-200971% 
MDA ADA RR UPGRADE PH4MD Anderson Cancer CenterCactus Builders$40,000.00Dec-200752% 
MDA ADDITIONAL FAN STACKMD Anderson Cancer CenterC-AIR-S Mechanical $60,482.00Oct-2003100% 
MDA AHU 1E1 REPLACEMENTMD Anderson Cancer CenterVaughn Construction$294,019.00Feb-201380% 
MDA AHU 1E1 REPLACEMENTMD Anderson Cancer CenterVaughn Construction$259,395.00Nov-201273% 
MDA AHU 4E 1&2MD Anderson Cancer CenterThe Trevino Group$184,556.00Sep-201160% 
MDA AHU 6C-1 REMOVALMD Anderson Cancer CenterCactus Builders$34,087.00Feb-201148% 
MDA AHU CS-B1 REPAIRMD Anderson Cancer CenterC-AIR-S Mechanical $14,586.00Aug-201015% 
MDA AHU ETV 1 REPLACEMENTMD Anderson Cancer CenterThe Trevino Group$99,320.00Feb-201363% 
MDA AHU OC 1,2 &3MD Anderson Cancer CenterVaughn Construction$1,254,427.00Jun-2014  
MDA AHU OC-4&5MD Anderson Cancer CenterVaughn Construction$1,201,978.00Jun-2014  
MDA AHU TB-1MD Anderson Cancer CenterThe Trevino Group$386,660.00Jun-201283% 
MDA AHU TB-1 HEAT COILSMD Anderson Cancer CenterThe Trevino Group$50,015.00Oct-201157% 
MDA ALKEK 3 TESLA MRIMD Anderson Cancer CenterVaughn Construction$14,246.00May-200477% 
MDA ALKEK LVL6 IDF RMSMD Anderson Cancer CenterHUNTON TRANE$22,844.00Aug-200697% 
MDA ALKEK ROOF FLEXMD Anderson Cancer CenterC-AIR-S Mechanical $12,047.00Oct-200389% 
MDA ALKEK SMOKE DOORS #2MD Anderson Cancer CenterC-AIR-S Mechanical $10,990.00Nov-200497% 
MDA ALKEK STERILE MODMD Anderson Cancer CenterVaughn Construction$13,989.00Jun-2007100% 
MDA ALLIED HEALTHMD Anderson Cancer CenterSouth Coast Construction$96,668.00Dec-200753% 
MDA ANDERSON EFS 2307MD Anderson Cancer CenterJOHNSON CONTROLS, INC$47,486.00Oct-200855% 
MDA ANESTH BACKFILLMD Anderson Cancer CenterCactus Builders$62,717.00Apr-200766% 
MDA ASBUILT BASEMENTMD Anderson Cancer CenterC-AIR-S Mechanical $47,000.00Mar-200887% 
MDA ATC/GUMD Anderson Cancer CenterC-AIR-S Mechanical $11,642.00Apr-200350% 
MDA AXIOM ROOMMD Anderson Cancer CenterVaughn Construction$12,793.00Sep-201120% 
MDA B.F. Breast ProgMD Anderson Cancer CenterCactus Builders$229,798.00Dec-200939% 
MDA B1 CLINICAL ENGINEERMD Anderson Cancer CenterThe Trevino Group$83,432.00Nov-200955% 
MDA B2 4492 TERMINAL BOXMD Anderson Cancer CenterCactus Builders$10,306.00Feb-201231% 
MDA B2 A/MONITOR#72MD Anderson Cancer CenterC-AIR-S Mechanical $11,776.00Mar-201015% 
MDA B2 RESTROOMSMD Anderson Cancer CenterSouth Coast Construction$17,138.00Jul-200699% 
MDA B2, 4450 VFD 2299MD Anderson Cancer CenterJOHNSON CONTROLS, INC$44,760.00Oct-200845% 
MDA B4 AND EAST LVL 4MD Anderson Cancer CenterCactus Builders$142,369.00Jun-201349% 
MDA B5 GIMBEL EXHAUSTMD Anderson Cancer CenterAlpha Building Corporation$16,708.00Dec-201485% 
MDA B7 BUILDBACKMD Anderson Cancer CenterSouth Coast Construction$48,048.00Jun-200467% 
MDA B7 PEDI STAFFMD Anderson Cancer CenterThe Trevino Group$53,323.00Dec-201361% 
MDA B8 PATHOLOGYMD Anderson Cancer CenterCactus Builders$38,995.00Feb-201341% 
MDA B8 PEDIATRICS RENOVMD Anderson Cancer CenterThe Trevino Group$68,696.00Jun-201251% 
MDA BASTROP GRILLESMD Anderson Cancer CenterMD ANDERSON$5,794.00May-200996% 
MDA BASTROP KEETSMD Anderson Cancer CenterBRANDES BROTHERS$52,602.00Jun-200972% 
MDA BASTROP PHOENIX #30MD Anderson Cancer CenterC-AIR-S Mechanical $14,121.00Aug-200968% 
MDA BATES FREEMAN EXHAUSTMD Anderson Cancer CenterSouth Coast Construction$38,620.00Mar-200484% 
MDA BATES FREEMAN PH 2MD Anderson Cancer CenterAlpha Building Corporation$41,055.00Oct-201395% 
MDA BB SUMP PUMP RMMD Anderson Cancer CenterC-AIR-S Mechanical $16,728.00Apr-200950% 
MDA BB.5168 LINEAR ACCELERATORMD Anderson Cancer CenterVaughn Construction$39,568.00May-200861% 
MDA BB4869 RADIOLOGY LABMD Anderson Cancer CenterVaughn Construction$27,098.00Oct-200561% 
MDA BF7 CHEMISTRY AREAMD Anderson Cancer CenterCactus Builders$48,464.00Mar-201443% 
MDA BLOOD DONORMD Anderson Cancer CenterSouth Coast Construction$13,193.00Mar-200699% 
MDA BLUE 1.4572 STEAM PIPINGMD Anderson Cancer CenterC-AIR-S Mechanical $29,110.00Jul-200363% 
MDA BMT LAB RENOMD Anderson Cancer CenterSouth Coast Construction$26,990.00Dec-200560% 
MDA BRAINSUITE 8-2592MD Anderson Cancer CenterVaughn Construction$112,785.00Dec-201125% 
MDA BRB AHU FLEX CONNECTORMD Anderson Cancer CenterC-AIR-S Mechanical $12,757.00Sep-2003100% 
MDA BRB AHU REPLACEMENTMD Anderson Cancer CenterCactus Builders$1,873,341.00Dec-200892% 
MDA BRB DEMOMD Anderson Cancer CenterCactus Builders$44,530.00Aug-200895% 
MDA BRB EXHAUST FANMD Anderson Cancer CenterThe Trevino Group$10,277.00Apr-201169% 
MDA BRB STM PRV RENOMD Anderson Cancer CenterSouth Coast Construction$43,998.00Dec-200480% 
MDA BRB5 STAINLESSMD Anderson Cancer CenterSouth Coast Construction$26,832.00Oct-200794% 
MDA BREAST MOLECULARMD Anderson Cancer CenterVaughn Construction$19,419.00Apr-201451% 
MDA BRRB CAGE WASH EXHMD Anderson Cancer CenterCactus Builders$131,611.00Dec-201282% 
MDA BSRB 4FM CMD CTR#80MD Anderson Cancer CenterAlpha Building Corporation$20,077.00Mar-201071% 
MDA BSRB 7&8MD Anderson Cancer CenterMD ANDERSON$42,690.00Feb-201189% 
MDA BSRB 9.82&11MD Anderson Cancer CenterMD ANDERSON$11,290.00Aug-2005100% 
MDA BSRB AHU W&D REMOVALMD Anderson Cancer CenterC-AIR-S Mechanical $10,920.00May-200697% 
MDA BSRB BIOLOGY LABMD Anderson Cancer CenterSouth Coast Construction$29,240.00Jan-200799% 
MDA BSRB FILLER RACKSMD Anderson Cancer CenterC-AIR-S Mechanical $13,624.00Sep-2008100% 
MDA BSRB LVL 14 LOUVERMD Anderson Cancer CenterC-AIR-S Mechanical $14,800.00May-200690% 
MDA BSRB S3 8371AMD Anderson Cancer CenterC-AIR-S Mechanical $14,119.00Aug-2008100% 
MDA BSRB STAINLESSMD Anderson Cancer CenterVaughn Construction$20,480.00May-200799% 
MDA BSRB STM PRV RENVMD Anderson Cancer CenterSouth Coast Construction$45,998.00Oct-200583% 
MDA BSRB VIV ARIUMMD Anderson Cancer CenterSouth Coast Construction$18,067.00Jul-200694% 
MDA BSRB7 SPACE NEEDSMD Anderson Cancer CenterThe Trevino Group$33,029.00Dec-201269% 
MDA BSRBS7.8221MD Anderson Cancer CenterCactus Builders$18,748.00Apr-201193% 
MDA C-9 DIAGNOSTIC EQUPIMENTMD Anderson Cancer CenterVaughn Construction$20,669.00Feb-201243% 
MDA CAGE WASHMD Anderson Cancer CenterVaughn Construction$162,260.00Nov-200971% 
MDA CANVASS REPL 13 AHUMD Anderson Cancer CenterC-AIR-S Mechanical $36,344.00Oct-200599% 
MDA CARDIO PHASE I&IIMD Anderson Cancer CenterCactus Builders$772,600.00Jun-200973% 
MDA CART FAN ADDMD Anderson Cancer CenterC-AIR-S Mechanical $10,332.00Sep-200961% 
MDA CART REPLINISHMENTMD Anderson Cancer CenterVaughn Construction$245,262.00Mar-200955% 
MDA CC1 IDF ROOMMD Anderson Cancer CenterHUNTON TRANE$26,632.00Jun-200855% 
MDA CHW REFRIG UNITSMD Anderson Cancer CenterC-AIR-S Mechanical $75,862.00Jun-200762% 
MDA CLARK BOILERSMD Anderson Cancer CenterThe Trevino Group$234,622.00Apr-201159% 
MDA CLARK BOILERSMD Anderson Cancer CenterThe Trevino Group$234,622.00May-201159% 
MDA CLARK CLINIC L1 FT EMD Anderson Cancer CenterVaughn Construction$30,030.00Jun-200956% 
MDA CLINICAL RESEARCH HOOD REPLACEMENTMD Anderson Cancer CenterSouth Coast Construction$107,244.00Oct-200599% 
MDA CODE & INFECT CENTRALMD Anderson Cancer CenterCactus Builders$24,368.00Feb-201330% 
MDA COIL REPL B7.4623MD Anderson Cancer CenterC-AIR-S Mechanical $16,353.00Jul-201095% 
MDA CORD BLOOD BANKMD Anderson Cancer CenterVaughn Construction$911,742.00Sep-2014  
MDA CPB HEX CHANGESMD Anderson Cancer CenterVaughn Construction$197,915.00Dec-201093% 
MDA CPB HUB ROOMMD Anderson Cancer CenterVaughn Construction$15,954.00Dec-200954% 
MDA CPB LEVEL 7 REMD Anderson Cancer CenterSouth Coast Construction$67,930.00Jan-200799% 
MDA CRB 4TH FLOORMD Anderson Cancer CenterCactus Builders$18,835.00Sep-200929% 
MDA CRB EXHAUST FANSMD Anderson Cancer CenterSouth Coast Construction$594,755.00Dec-200480% 
MDA CRB HUMID MODSMD Anderson Cancer CenterSouth Coast Construction$23,684.00Apr-200882% 
MDA CRB HW LOOPMD Anderson Cancer CenterC-AIR-S Mechanical $27,242.00Aug-200599% 
MDA CRB HW LOOPMD Anderson Cancer CenterC-AIR-S Mechanical $27,242.00Oct-200534% 
MDA CRB LN2 FREEZERMD Anderson Cancer CenterSouth Coast Construction$54,275.00Jun-200939% 
MDA CRB LVL 7 GU REDEVELOPMENTMD Anderson Cancer CenterHC Beck$41,836.00Oct-200727% 
MDA CRB REFRIG SHOPMD Anderson Cancer CenterALTA MERE$16,052.00Mar-200945% 
MDA CROSS OVER PIPINGMD Anderson Cancer CenterJOHNSON CONTROLS, INC$90,442.00Oct-20081% 
MDA CRU AHU-GE-1MD Anderson Cancer CenterJOHNSON CONTROLS, INC$19,940.00Nov-200863% 
MDA CRUS LUTHERANMD Anderson Cancer CenterJOHNSON CONTROLS, INC$133,335.00Oct-200845% 
MDA CT EMERGENCY CTR.MD Anderson Cancer CenterCactus Builders$131,549.00Sep-201455% 
MDA CT FILTERS BYPASSMD Anderson Cancer CenterC-AIR-S Mechanical $16,643.00Jun-2007100% 
MDA CT ON RAILSMD Anderson Cancer CenterVaughn Construction$40,610.00Sep-200962% 
MDA DCT LEVEL 13 VAVMD Anderson Cancer CenterCactus Builders$11,894.00Nov-201256% 
MDA DIAGNOSTIC IMAGINMD Anderson Cancer CenterVaughn Construction$28,747.00Feb-201224% 
MDA DINING ROOM GRILLESMD Anderson Cancer CenterThe Trevino Group$10,200.00Feb-201289% 
MDA DINING SERVICES REDESIGNMD Anderson Cancer CenterSouth Coast Construction$30,129.00Dec-200449% 
MDA DISHWASHERMD Anderson Cancer CenterVaughn Construction$103,168.00Jul-200949% 
MDA DUAL DUCT AHU-CH-B1MD Anderson Cancer CenterThe Trevino Group$276,542.00Nov-201480% 
MDA EF OC 2305MD Anderson Cancer CenterJOHNSON CONTROLS, INC$51,630.00Oct-200863% 
MDA EFS ANDERSON 2309MD Anderson Cancer CenterJOHNSON CONTROLS, INC$15,320.00Oct-200853% 
MDA EFS CLARK 2280MD Anderson Cancer CenterJOHNSON CONTROLS, INC$38,240.00Oct-200850% 
MDA EFS LUTHERAN 2306MD Anderson Cancer CenterJOHNSON CONTROLS, INC$46,457.00Oct-200874% 
MDA EL RIO CHILLER PUMPMD Anderson Cancer CenterC-AIR-S Mechanical $14,924.00Apr-201268% 
MDA ELEVATOR PITMD Anderson Cancer CenterJOHNSON CONTROLS, INC$32,659.00Oct-20082% 
MDA EMER PIPE REPAIRMD Anderson Cancer CenterC-AIR-S Mechanical $60,825.00May-200670% 
MDA EMERGENCY 7-2 FANMD Anderson Cancer CenterC-AIR-S Mechanical $36,680.00Nov-201079% 
MDA EMERGENCY AHU REPAIRMD Anderson Cancer CenterC-AIR-S Mechanical $112,405.00Dec-200755% 
MDA EMERGENCY PIPE REPAIRMD Anderson Cancer CenterC-AIR-S Mechanical $60,825.00May-200690% 
MDA ENVIRO ROOM UPGRADESMD Anderson Cancer CenterC-AIR-S Mechanical $10,476.00Aug-200691% 
MDA EOM STEAM TRAPSMD Anderson Cancer CenterC-AIR-S Mechanical $11,000.00Nov-200862% 
MDA ERO BACKFILLMD Anderson Cancer CenterCactus Builders$120,835.00Sep-200783% 
MDA EXH FAN G8.3422MD Anderson Cancer CenterVaughn Construction$89,016.00Jun-201435% 
MDA EXHAUST FAN STACK REPTMD Anderson Cancer CenterC-AIR-S Mechanical $70,865.00Apr-2003100% 
MDA F/S DAMPER REPAIRMD Anderson Cancer CenterVaughn Construction$177,140.00Mar-200866% 
MDA FACULTY CTR LEVEL 11MD Anderson Cancer CenterCactus Builders$24,924.00Apr-201237% 
MDA FANNIN INFRA PH1MD Anderson Cancer CenterC-AIR-S Mechanical $90,980.00Mar-200694% 
MDA FANNIN INFRA PH1MD Anderson Cancer CenterSouth Coast Construction$90,980.00Mar-200681% 
MDA FANNIN INFRASTRUCTURE PH1MD Anderson Cancer CenterSouth Coast Construction$90,980.00Mar-200681% 
MDA FC LVL 6 LYMPHOMAMD Anderson Cancer CenterMD ANDERSON$13,333.00Sep-200464% 
MDA FC1.1032 HEAT EXCHGRMD Anderson Cancer CenterCactus Builders$69,340.00Nov-201412% 
MDA FC3 LEUKEMIA MIDLVLMD Anderson Cancer CenterCactus Builders$17,763.00Jun-201335% 
MDA FCT DUCT EMERG REPAIRMD Anderson Cancer CenterThe Trevino Group$43,504.00Sep-201446% 
MDA FCT3.4134 #28MD Anderson Cancer CenterCactus Builders$30,838.00Dec-200952% 
MDA FHB 11 FLOORMD Anderson Cancer CenterSouth Coast Construction$50,940.00Aug-200679% 
MDA FHB ENERGY PROJMD Anderson Cancer CenterSouth Coast Construction$14,028.00Jul-200638% 
MDA FHB LIBRARYMD Anderson Cancer CenterHUNTON TRANE$26,385.00May-200758% 
MDA FHB OFFICE RENO#98MD Anderson Cancer CenterAlpha Building Corporation$76,917.00Jun-201094% 
MDA FHB PHASE 2MD Anderson Cancer CenterSouth Coast Construction$20,197.00Mar-200694% 
MDA FHB PHASE 2MD Anderson Cancer CenterSouth Coast Construction$20,197.00Mar-200694% 
MDA FHB RESTROOMSMD Anderson Cancer CenterCactus Builders$28,810.00Dec-200774% 
MDA FHB VEST. FCUMD Anderson Cancer CenterC-AIR-S Mechanical $14,162.00Aug-200363% 
MDA FIRE STOPPINGMD Anderson Cancer CenterVaughn Construction$13,002.00Aug-200524% 
MDA FMP CLINICAL REV#104MD Anderson Cancer CenterAlpha Building Corporation$19,754.00Mar-2010100% 
MDA G1 BUS RELOC/R7 EXMMD Anderson Cancer CenterCactus Builders$23,609.00Dec-201237% 
MDA G1 RESEARCHMD Anderson Cancer CenterCactus Builders$35,754.00Feb-201349% 
MDA G1.3675 PATH EXH SYSMD Anderson Cancer CenterCactus Builders$17,026.00Apr-201277% 
MDA G11 NURSES TRAIN RMMD Anderson Cancer CenterCactus Builders$19,052.00Sep-201277% 
MDA G14 PHARMACYMD Anderson Cancer CenterCactus Builders$13,110.00Mar-2013  
MDA G2 IT ROOMMD Anderson Cancer CenterC-AIR-S Mechanical $14,223.00Aug-201073% 
MDA G2 IT/BATT.RM UPGRADEMD Anderson Cancer CenterCactus Builders$226,639.00Jul-201275% 
MDA G7 PHARMACY #55MD Anderson Cancer CenterVaughn Construction$111,551.00Sep-201048% 
MDA G8 FCUMD Anderson Cancer CenterC-AIR-S Mechanical $19,931.00Jul-200851% 
MDA GAMMA KNIFEMD Anderson Cancer CenterVaughn Construction$13,699.00Oct-200964% 
MDA GB.3633 LINEAR ACCELMD Anderson Cancer CenterVaughn Construction$33,414.00Apr-201354% 
MDA GENIT ONCOLOGYMD Anderson Cancer CenterC-AIR-S Mechanical $14,396.00Feb-201050% 
MDA GIMBEL HEX4-1MD Anderson Cancer CenterVaughn Construction$68,943.00Dec-200886% 
MDA GIMBLE CRB CROSSOVERMD Anderson Cancer CenterCactus Builders$56,521.00Sep-201050% 
MDA GIMBLE HEX MODSMD Anderson Cancer CenterCactus Builders$1,845,657.00Feb-201262% 
MDA GUHN RDMD Anderson Cancer CenterSouth Coast Construction$109,111.00Aug-2006100% 
MDA GUHN RD VALVESMD Anderson Cancer CenterSouth Coast Construction$109,111.00Aug-200625% 
MDA GUHN RD. OAMD Anderson Cancer CenterSouth Coast Construction$43,647.00Oct-200568% 
MDA HEAT EXCHANGERMD Anderson Cancer CenterC-AIR-S Mechanical $479,367.00Sep-200697% 
MDA HEMATOPATHOLOGYMD Anderson Cancer CenterCactus Builders$25,727.00Mar-200873% 
MDA HEMPATH SHARED TC RMMD Anderson Cancer CenterThe Trevino Group$32,883.00Oct-201161% 
MDA HEX LUTHERANMD Anderson Cancer CenterJOHNSON CONTROLS, INC$248,338.00Sep-200923% 
MDA HEX OC 1&2MD Anderson Cancer CenterJOHNSON CONTROLS, INC$300,939.00Sep-200956% 
MDA HX CHILL WATERMD Anderson Cancer CenterJOHNSON CONTROLS, INC$167,538.00Oct-200884% 
MDA IDF RM BB4802#16MD Anderson Cancer CenterCactus Builders$21,976.00Jul-201062% 
MDA IDF ROOM UPGRADESMD Anderson Cancer CenterCactus Builders$158,514.00Jul-201257% 
MDA IDIQ. G13.3501 STEAMMD Anderson Cancer CenterC-AIR-S Mechanical$12,602.00Apr-201358% 
MDA INCENERATORMD Anderson Cancer CenterVaughn Construction$34,865.00Apr-200699% 
MDA INSTALL 2 AHU ON R5MD Anderson Cancer CenterC-AIR-S Mechanical $11,700.00Oct-200586% 
MDA INTERNAL MEDICINE OFFICE RELOCATIONMD Anderson Cancer CenterSouth Coast Construction$11,047.00Apr-200478% 
MDA INVES CANCER THERAMD Anderson Cancer CenterThe Trevino Group$27,512.00Aug-200971% 
MDA ISO DAMPER FAN43MD Anderson Cancer CenterC-AIR-S Mechanical $18,432.00Sep-2008100% 
MDA IT NETWORK REPLACEMENTMD Anderson Cancer CenterThe Trevino Group$95,761.00Feb-201261% 
MDA KAP COLD REPLACEMENTMD Anderson Cancer CenterCactus Builders$98,893.00Jun-201278% 
MDA KATY EXPANSION #83MD Anderson Cancer CenterLinbeck Group$275,015.00Jun-201084% 
MDA KATY SURGICAL ONCOLOMD Anderson Cancer CenterLINCOLN BUILDERS$29,996.00Oct-201173% 
MDA KATY VAULT CHILLERMD Anderson Cancer CenterLINCOLN BUILDERS$99,728.00Oct-201179% 
MDA KITCHENMD Anderson Cancer CenterAustin Commercial$385,138.00Mar-200866% 
MDA KITCHEN PHS. II & IIIMD Anderson Cancer CenterAustin Commercial$907,889.00Feb-200040% 
MDA KITCHEN STEAMER & HDMD Anderson Cancer CenterCactus Builders$42,629.00Jun-201478% 
MDA LAB MED COREMD Anderson Cancer CenterCactus Builders$95,134.00Feb-201047% 
MDA LAB MEDICINE EXPANSIONMD Anderson Cancer CenterSouth Coast Construction$15,148.00Dec-2003100% 
MDA LAB Y4.5824 FCUMD Anderson Cancer CenterC-AIR-S Mechanical $48,646.00Apr-200356% 
MDA LE MAISTRE EXH 2308MD Anderson Cancer CenterJOHNSON CONTROLS, INC$54,339.00Oct-200868% 
MDA LEAN TEAM LABMD Anderson Cancer CenterVaughn Construction$30,633.00Dec-2005100% 
MDA LEIBERT ADDITIONSMD Anderson Cancer CenterVaughn Construction$110,653.00May-200888% 
MDA LEIBERT PIPE ADDMD Anderson Cancer CenterC-AIR-S Mechanical $11,957.00Apr-200754% 
MDA Leukemia Recruit Lvl 6MD Anderson Cancer CenterThe Trevino Group$10,596.00Apr-20146% 
MDA LEUKIMIA CTR RENOMD Anderson Cancer CenterSouth Coast Construction$25,949.00Oct-200545% 
MDA LIBRARYMD Anderson Cancer CenterC-AIR-S Mechanical $26,080.00Apr-200862% 
MDA LOVE 8 VAV BOXESMD Anderson Cancer CenterCactus Builders$101,087.00May-201437% 
MDA LUTHERAN AHUSMD Anderson Cancer CenterVaughn Construction$2,129,875.00Oct-201283% 
MDA Lutheran ATU BoxesMD Anderson Cancer CenterVaughn Construction$45,324.00Dec-201427% 
MDA LUTHERAN PENT AHUMD Anderson Cancer CenterHC Beck$139,922.00Dec-200526% 
MDA LUTHERAN PUMP TRAPSMD Anderson Cancer CenterJOHNSON CONTROLS, INC$52,880.00Oct-200887% 
MDA LYMPHOMA R6MD Anderson Cancer CenterSouth Coast Construction$26,902.00Aug-200662% 
MDA MAMMOGRAPHY FOR DIAGMD Anderson Cancer CenterC-AIR-S Mechanical $9,376.00May-200346% 
MDA MATERIALS MANAGEMENTMD Anderson Cancer CenterCactus Builders$321,699.00Dec-200968% 
MDA MELONOMA & SKIN CTRMD Anderson Cancer CenterVaughn Construction$105,446.00Jun-200856% 
MDA MID CAMPUS AT&TMD Anderson Cancer CenterCactus Builders$94,695.00Apr-201370% 
MDA MOD AHU REPLACEMENTMD Anderson Cancer CenterCactus Builders$462,022.00Oct-200891% 
MDA MORGUEMD Anderson Cancer CenterCactus Builders$82,535.00Dec-201456% 
MDA MRI HOSESMD Anderson Cancer CenterC-AIR-S Mechanical $18,450.00May-2008100% 
MDA MSF GOWNING RM CHGSMD Anderson Cancer CenterVaughn Construction$29,197.00Dec-201451% 
MDA N B. LINAC CHILLERMD Anderson Cancer CenterVaughn Construction$84,446.00Aug-201292% 
MDA NASSAU BAY MINIMATEMD Anderson Cancer CenterLinbeck Group$11,946.00Jul-2010100% 
MDA NC CLINICMD Anderson Cancer CenterCactus Builders$252,018.00May-201449% 
MDA NEW CLARK CHILL WATER FREEZEMD Anderson Cancer CenterC-AIR-S Mechanical $36,000.00Nov-200698% 
MDA NEW CLARK CLINC OAHMD Anderson Cancer CenterVaughn Construction$564,263.00Oct-200557% 
MDA NIRUS HVAC ADDITIONS Cactus Builders$14,480.00   
MDA NON OR #7MD Anderson Cancer CenterCactus Builders$151,043.00Jun-201059% 
MDA NUCLEAR SPECT CTMD Anderson Cancer CenterVaughn Construction$138,576.00Sep-201148% 
MDA NUCLEIC ACID LABMD Anderson Cancer CenterSouth Coast Construction$35,116.00Oct-200347% 
MDA OC HW VALVESMD Anderson Cancer CenterC-AIR-S Mechanical $16,348.00Mar-200889% 
MDA OC PRVMD Anderson Cancer CenterSouth Coast Construction$248,160.00Oct-200891% 
MDA OCC AHU C12 -51MD Anderson Cancer CenterVaughn Construction$92,737.00Sep-201359% 
MDA P13 AHU REPAIRMD Anderson Cancer CenterVaughn Construction$160,000.00Sep-200794% 
MDA P14 BMT LABMD Anderson Cancer CenterSouth Coast Construction$22,404.00Dec-200545% 
MDA PATH BONE GROSSINGMD Anderson Cancer CenterThe Trevino Group$22,907.00Nov-201473% 
MDA PATIENT CAREMD Anderson Cancer CenterVaughn Construction$40,862.00Jul-200375% 
MDA PAVILLION-SPMD Anderson Cancer CenterVaughn Construction$347,871.00Dec-201490% 
MDA PAWNEE STORAGEMD Anderson Cancer CenterVaughn Construction$40,732.00Oct-200598% 
MDA PB .3102 EXHAUST FANMD Anderson Cancer CenterVaughn Construction$34,973.00Sep-201360% 
MDA PET CT RENO ACB6MD Anderson Cancer CenterVaughn Construction$68,666.00Apr-201452% 
MDA PEVCO INSULATIONMD Anderson Cancer CenterSouth Coast Construction$12,369.00Mar-200950% 
MDA PHARMACY ACB4&8MD Anderson Cancer CenterVaughn Construction$201,721.00May-200980% 
MDA PHARMACY ADMI OFFMD Anderson Cancer CenterC-AIR-S Mechanical $14,243.00Jul-200698% 
MDA PHARMACY G5, 9, 11MD Anderson Cancer CenterVaughn Construction$145,963.00Feb-201041% 
MDA PHARMACY P12.302MD Anderson Cancer CenterVaughn Construction$11,475.00Oct-2003100% 
MDA PHARMACY P12.302MD Anderson Cancer CenterVaughn Construction$11,475.00Feb-2004100% 
MDA PHARMACY RENOV R10MD Anderson Cancer CenterVaughn Construction$79,998.00Jul-200924% 
MDA Pot Washer ReplaceMD Anderson Cancer CenterVaughn Construction$47,117.00Sep-200948% 
MDA PPB AHU REPAIRMD Anderson Cancer CenterC-AIR-S Mechanical $758,640.00Mar-201467% 
MDA PPB VAVARIUM DUCTWORKMD Anderson Cancer CenterCactus Builders$23,350.00Dec-201436% 
MDA PRESIDENTS OFF. RENOMD Anderson Cancer CenterCactus Builders$22,247.00Oct-201346% 
MDA PRESSLER GARAGEMD Anderson Cancer CenterVaughn Construction$32,098.00Feb-200865% 
MDA PRVMD Anderson Cancer CenterJOHNSON CONTROLS, INC$113,183.00Oct-20081% 
MDA PRV FOR RB .2200MD Anderson Cancer CenterSouth Coast Construction$61,233.00Feb-200480% 
MDA R&NS INSTALLMD Anderson Cancer CenterHUNTON TRANE$20,600.00Oct-200889% 
MDA R1 DUCT&PIPEMD Anderson Cancer CenterVaughn Construction$149,285.00Mar-200951% 
MDA R1 INSTALLMD Anderson Cancer CenterHUNTON TRANE$17,000.00Jul-200888% 
MDA R1 VAVMD Anderson Cancer CenterCactus Builders$10,841.00Apr-201256% 
MDA R10.2354A VAVMD Anderson Cancer CenterCactus Builders$12,778.00Apr-201251% 
MDA R11N INSTALLMD Anderson Cancer CenterHUNTON TRANE$10,800.00Dec-200796% 
MDA R11N&S DUCT & PIPEMD Anderson Cancer CenterVaughn Construction$160,048.00Mar-200855% 
MDA R11S INSTALLMD Anderson Cancer CenterHUNTON TRANE$10,800.00Mar-200860% 
MDA R12,2511MD Anderson Cancer CenterHUNTON TRANE$18,236.00Jan-2006100% 
MDA R2 N&S DUCT & PIPEMD Anderson Cancer CenterVaughn Construction$175,299.00Jun-200944% 
MDA R2NS AHU INSTALLMD Anderson Cancer CenterHUNTON TRANE$14,000.00Jun-200774% 
MDA R2NS INSTALLMD Anderson Cancer CenterVaughn Construction$67,728.00Apr-200857% 
MDA R3. 1853 VAVMD Anderson Cancer CenterSouth Coast Construction$12,674.00Oct-200554% 
MDA R3N, 12N INSTALLMD Anderson Cancer CenterHUNTON TRANE$14,400.00Jan-200799% 
MDA R3S AHU INSTALLMD Anderson Cancer CenterHUNTON TRANE$9,750.00Sep-200766% 
MDA R3S DUCT & PIPEMD Anderson Cancer CenterVaughn Construction$68,121.00Oct-200749% 
MDA R4&R11 UNITS TRANEMD Anderson Cancer CenterHUNTON TRANE$27,499.00Jul-200696% 
MDA R4. 1178 VFD 2298MD Anderson Cancer CenterJOHNSON CONTROLS, INC$20,335.00Oct-200851% 
MDA R42309 TERMINALMD Anderson Cancer CenterCactus Builders$50,369.00Jun-201359% 
MDA R4N, 4S, 12N INSTALLMD Anderson Cancer CenterHUNTON TRANE$20,160.00Jan-200799% 
MDA R8 BMT RESEARCHMD Anderson Cancer CenterC-AIR-S Mechanical $10,000.00Mar-200764% 
MDA R9, 1040MD Anderson Cancer CenterCactus Builders$11,705.00Nov-200753% 
MDA R9NS AHU INSTALLMD Anderson Cancer CenterHUNTON TRANE$22,050.00Sep-200791% 
MDA RB AHU INSTALLMD Anderson Cancer CenterHUNTON TRANE$34,000.00Oct-200884% 
MDA RB DUCT&PIPEMD Anderson Cancer CenterVaughn Construction$394,052.00Mar-200942% 
MDA RB. 1100 VFD 2287MD Anderson Cancer CenterJOHNSON CONTROLS, INC$11,738.00Oct-20086% 
MDA RB12.1505 EXP TANKMD Anderson Cancer CenterC-AIR-S Mechanical $14,755.00Mar-200790% 
MDA RBOC 1 EMERGMD Anderson Cancer CenterC-AIR-S Mechanical $8,782.00Jul-200678% 
MDA RBOC 4&5 EMERGMD Anderson Cancer CenterC-AIR-S Mechanical $19,615.00Jul-200698% 
MDA REDUNDANT WELCOMEMD Anderson Cancer CenterSouth Coast Construction$82,548.00Oct-200599% 
MDA RH1 DATA & VOICEMD Anderson Cancer CenterCactus Builders$28,037.00Aug-201260% 
MDA ROSE ZONE IDF-duplicateMD Anderson Cancer CenterCactus Builders$293,854.00Aug-201352% 
MDA ROTARY HOUSE COLD ROOMMD Anderson Cancer CenterCactus Builders$18,621.00May-201289% 
MDA S1 EXHAUST VALVESMD Anderson Cancer CenterThe Trevino Group$21,174.00Aug-201276% 
MDA SCRB 1&2 AHU LOUVERMD Anderson Cancer CenterThe Trevino Group$87,893.00Feb-201237% 
MDA SCRB COOLING TOWERMD Anderson Cancer CenterC-AIR-S Mechanical $14,396.00Nov-200656% 
MDA SCRB1 HW PIPE REVMD Anderson Cancer CenterC-AIR-S Mechanical $24,816.00Nov-200785% 
MDA SIEMENS OR VALVESMD Anderson Cancer CenterSIEMENS BUILDING TECHNOLOGIES$71,400.00Sep-200942% 
MDA SITE FACILITIES PH-2MD Anderson Cancer CenterC-AIR-S Mechanical $10,000.00Feb-2004100% 
MDA SPOT COOLERS MD ANDERSON$14,273.00   
MDA SRB AHU 16 REPLACEMD Anderson Cancer CenterCactus Builders$366,248.00May-201288% 
MDA SRB C/T SUMPMD Anderson Cancer CenterC-AIR-S Mechanical $13,309.00Dec-2009100% 
MDA SRB COIL REPLACEMENTMD Anderson Cancer CenterVaughn Construction$59,944.00May-200477% 
MDA SRB CP FCUsMD Anderson Cancer CenterC-AIR-S Mechanical $12,898.00Jan-200449% 
MDA SRB DAMPERSMD Anderson Cancer CenterC-AIR-S Mechanical $13,425.00Nov-200357% 
MDA SRB HW HEATER REPLMD Anderson Cancer CenterC-AIR-S Mechanical $95,000.00Oct-200582% 
MDA SRB INTAKE MODSMD Anderson Cancer CenterC-AIR-S Mechanical $10,743.00Sep-200886% 
MDA SRB OUTSIDE AIR DUCTMD Anderson Cancer CenterC-AIR-S Mechanical $14,925.00Nov-200258% 
MDA SRB OUTSIDE AIR SUCTMD Anderson Cancer CenterC-AIR-S Mechanical $14,925.00Nov-200258% 
MDA SRB PVC PIPEMD Anderson Cancer CenterC-AIR-S Mechanical $14,829.00Feb-200933% 
MDA SWING SPACEMD Anderson Cancer CenterCactus Builders$19,416.00Sep-201073% 
MDA T2 F/W REPLACEMENTMD Anderson Cancer CenterC-AIR-S Mechanical $1,374,173.00Mar-201178% 
MDA T4 OFFICE CONVERSIONMD Anderson Cancer CenterCactus Builders$111,376.00Aug-201241% 
MDA T7 DR. FRIEDLMD Anderson Cancer CenterCactus Builders$120,316.00Apr-201257% 
MDA TAN 9 FAN REPLACEMENTMD Anderson Cancer CenterSouth Coast Construction$1,093,849.00Nov-200350% 
MDA TAN 9 INT BUILDOUTMD Anderson Cancer CenterHarvey Builders$457,430.00Dec-200561% 
MDA TAN EXH PIPE REPAIRMD Anderson Cancer CenterMD Construction$15,000.00Apr-201439% 
MDA TAN HUM SOLENOID VAMD Anderson Cancer CenterC-AIR-S Mechanical $16,289.00Jan-2004100% 
MDA TEACHING LABMD Anderson Cancer CenterVaughn Construction$107,149.00Aug-200958% 
MDA TEACHING LABMD Anderson Cancer CenterVaughn Construction$107,149.00Feb-200958% 
MDA Telecom B2.4754MD Anderson Cancer CenterVaughn Construction$11,958.00Mar-201450% 
MDA TEMP STORAGEMD Anderson Cancer CenterThe Trevino Group$11,696.00Aug-201381% 
MDA TEMPTROL HVAC MODMD Anderson Cancer CenterSouth Coast Construction$231,369.00Mar-200459% 
MDA TEMPTROL HVAS MODMD Anderson Cancer CenterSouth Coast Construction$231,369.00Sep-200367% 
MDA UPTD TO EL RIOMD Anderson Cancer CenterSouth Coast Construction$102,954.00May-200799% 
MDA UTPD HUB RM-INSTALLMD Anderson Cancer CenterMD ANDERSON$14,890.00Dec-201130% 
MDA UTPD HUB ROOMMD Anderson Cancer CenterC-AIR-S Mechanical $12,070.00Sep-201129% 
MDA UTPD HVAC MODSMD Anderson Cancer CenterC-AIR-S Mechanical $14,800.00Oct-200866% 
MDA UTPD TO EL RIOMD Anderson Cancer CenterSouth Coast Construction$104,029.00Mar-200862% 
MDA VET MED LASSER LABMD Anderson Cancer CenterCactus Builders$43,090.00Apr-201241% 
MDA VET MEDMD Anderson Cancer CenterCactus Builders$12,664.00Nov-200934% 
MDA VOLUNTEER SERVICESMD Anderson Cancer CenterSouth Coast Construction$56,777.00Jul-200358% 
MDA XRO LAB OR TERRYMD Anderson Cancer CenterSouth Coast Construction$716,000.00Jan-2007100% 
MDA Y1.53126 FCUMD Anderson Cancer CenterC-AIR-S Mechanical $11,133.00Nov-200356% 
MDA Y3 ONCOLOGY #75MD Anderson Cancer CenterThe Trevino Group$22,948.00Jun-201080% 
MDA Y3 TISSUE CULTUREMD Anderson Cancer CenterThe Trevino Group$36,034.00Feb-201377% 
MDA Y3.5823 LAB REMODELMD Anderson Cancer CenterCactus Builders$11,919.00Nov-201252% 
MDA Y4 BF REMODEL #44MD Anderson Cancer CenterThe Trevino Group$88,201.00Jun-201066% 
MDA Y7 PathologyMD Anderson Cancer CenterCactus Builders$37,732.00Feb-201041% 
MDA Y8 LAB RENO #19MD Anderson Cancer CenterCactus Builders$164,506.00Jun-201048% 
MDA-ACB STRAINER PROJECTMD Anderson Cancer CenterVaughn Construction$90,608.00Mar-201049% 
MDA-B1 BED STORAGEMD Anderson Cancer CenterVaughn Construction$11,716.00Apr-200885% 
MDA-EAST PED BRIDGEMD Anderson Cancer CenterVaughn Construction$179,775.00Dec-200959% 
MDA-FREEZERMD Anderson Cancer CenterSouth Coast Construction$65,436.00May-20086% 
MDAHMB LEIBERT MOVEMD Anderson Cancer CenterC-AIR-S Mechanical $14,868.00Nov-200698% 
MDA-HR TMC 1.3200MD Anderson Cancer CenterSouth Coast Construction$23,202.00Jul-200879% 
MDA-KITCHENMD Anderson Cancer CenterAustin Commercial$368,779.00Mar-200866% 
MDA-LE MAISTRE HEX CONTROLSMD Anderson Cancer CenterJOHNSON CONTROLS, INC$81,816.00Oct-20086% 
MDA-OC-AHU 7, 8, 9, 10, 11, 1MD Anderson Cancer CenterJOHNSON CONTROLS, INC$848,641.00Sep-200928% 
MDA-R1 1929 freezer drMD Anderson Cancer CenterC-AIR-S Mechanical $10,906.00Mar-2009100% 
MDA-R12437A FREEZER DOORMD Anderson Cancer CenterC-AIR-S Mechanical $11,640.00Mar-2009100% 
MDA-SRB MOD BUILDING PIPINGMD Anderson Cancer CenterSouth Coast Construction$83,760.00Dec-200348% 
MED METRICS 2121 SAGEMED METRICSRay Scaggs Construction Co$28,064.00May-200982% 
MEDICAL CENTER KIDNEY CLINCIMEDICAL CENTER KIDNET CLINCIThe Trevino Group$42,523.00Mar-200481% 
MEMCMEMCLSC Constructors$45,025.00Feb-2013100% 
MEMORIAL HERMAN SOUTH EAST LVL. 3Memorial Herman Hospital SysSPAWMAXWELL$81,982.00Sep-200738% 
MEMORIAL HERMANN EYE CENTERMemorial Herman Hospital SysSPAWMAXWELL$18,527.00Feb-2000100% 
MEMORIAL HERMANN KATY STEAMMemorial Herman Hospital SysC-AIR-S Mechanical $10,428.00May-200499% 
MESA ENGINEERINGMESA ENGINEERINGMESA ENGINEERING$48,403.00Apr-201278% 
METHODIST 1102 FIXThe Methodist HospitalC-AIR-S Mechanical $28,550.00May-200336% 
METHODIST ANNEX RADIATION THERAPYThe Methodist HospitalDurotech $288,648.00Oct-199995% 
METHODIST BREAST CAREThe Methodist HospitalSPAW MAXWELL$187,235.00Jun-200353% 
METHODIST BROWN GENERATOR UPGRADEThe Methodist HospitalThe Trevino Group$74,143.00Aug-1997100% 
METHODIST BROWN LEVEL 2 HLV LABThe Methodist HospitalThe Trevino Group$11,966.00Jan-2001100% 
METHODIST CATH LABThe Methodist HospitalVaughn Construction$96,987.00Aug-1997100% 
METHODIST CHILLER BOILER REPLOCATIONMTHODIST HOSPITALC-AIR-S Mechanical $170,433.00Jan-1999100% 
METHODIST CT HOLDINGThe Methodist HospitalThe Trevino Group$11,248.00Jul-200564% 
METHODIST CVICU WAITINGThe Methodist HospitalThe Trevino Group$131,693.00Jun-2001100% 
METHODIST EMPLOYEE HEALTH CLINICThe Methodist HospitalVaughn Construction$16,909.00Jan-1998100% 
METHODIST ENDOVASCULAR CENTERThe Methodist HospitalVaughn Construction$80,386.00Apr-200373% 
METHODIST ER X-RAYThe Methodist HospitalVaughn Construction$10,685.00Mar-200464% 
METHODIST HOSPITAL SMITH BUILDING INTERVENTIONAL CARDIOLOGY ASSOCIATESThe Methodist HospitalThe Trevino Group$10,880.00Feb-2000100% 
METHODIST LEVEL 8 PHARMACYThe Methodist HospitalThe Trevino Group$19,547.00Oct-200270% 
METHODIST MAIN DOCKThe Methodist HospitalVaughn Construction$39,671.00Dec-200438% 
METHODIST MAIN WEST GENERATORThe Methodist HospitalVaughn Construction$74,675.00Nov-1998100% 
METHODIST MICU RELOCATIONThe Methodist HospitalVaughn Construction$54,688.00Sep-1998100% 
METHODIST NEUROSURGICALThe Methodist HospitalThe Trevino Group$10,964.00Sep-1997100% 
METHODIST NURSES STATION LEVEL 6The Methodist HospitalSouth Coast Construction$13,691.00Jul-1998100% 
METHODIST WILLOWBROOKThe Methodist HospitalSPAWMAXWELL$199,701.00Apr-2002100% 
METHODIST WILLOWBROOK LEVEL 3 ADMINThe Methodist HospitalSPAWMAXWELL$17,056.00Jun-200361% 
METHODIST WILLOWBROOK PT/OTThe Methodist HospitalSPAWMAXWELL$16,158.00Jul-200451% 
METHODIST WILLOWBROOK SHORT TERMThe Methodist HospitalSPAWMAXWELL$42,105.00Aug-200344% 
MH 9301 SW FRY STE 125Memorial Herman Hospital SysFleetwood Masters Construction $10,756.00Dec-200587% 
MH KATY CATH LABMemorial Herman Hospital SysSPAW MAXWELL$173,976.00Mar-200860% 
MH SUGAR CREEKMemorial Herman Hospital SysSPAW MAXWELL$566,670.00May-200870% 
MH WESTSIDEMemorial Herman Hospital SysMEMORIAL HERMAN KATY$69,911.00Mar-200896% 
MH WOODLANDS OR CHILLERMemorial Herman Hospital SysSPAWMAXWELL$107,760.00Sep-200662% 
MHHS BI-PLANEMemorial Herman Hospital SysJEDUNN$74,352.00Dec-2011100% 
MHHS HOUSTON IVFMemorial Herman Hospital SysSPAW MAXWELL$452,918.00Mar-200958% 
MHHS- SOUTHEAST CATH LABMemorial Herman Hospital SysSPAWMAXWELL$33,381.00Dec-200387% 
MHHS WOODLANDS CARDIOMemorial Herman Hospital SysSPAW MAXWELL$20,868.00Aug-200663% 
MHNW CARDIOLOGYMemorial Herman Hospital SysSPAWMAXWELL$165,329.00Dec-200556% 
MHSW- CATH LAB #3Memorial Herman Hospital SysSPAWMAXWELL$31,201.00Apr-200331% 
MHSW IVORMemorial Herman Hospital SysSPAW MAXWELL$194,521.00Mar-200853% 
MHSW OR 23Memorial Herman Hospital SysSPAWMAXWELL$12,206.00Jan-200753% 
MHSW OR 24 &25Memorial Herman Hospital SysSPAWMAXWELL$34,917.00Feb-200798% 
MHSW- POB 1 LOBBYMemorial Herman Hospital SysThe Trevino Group$15,626.00Dec-200567% 
MHTMC PATIENT RM RENOMemorial Herman Hospital SysJE Junn Construction$13,975.00Feb-2013100% 
MICROALLOYINGMICROALLOYINGNorthwinds Construction$17,926.00Nov-201095% 
MMC BAY AREA GASTROMainland Medical CenterBFJ Construction$19,550.00Oct-200649% 
MMC- TEXAS CITY SURGICALMainland Medical CenterBFJ Construction$19,705.00Sep-200641% 
MOKSHAMOKSHAB. Bell Builders$27,750.00Dec-200681% 
MORTONMORTONSTORY CONSTRUCTION$15,766.00Nov-200889% 
MOTIVA FUEL PIPE VALVESMotiva Enterprises, LLCB. Bell Builders$12,944.00Sep-201495% 
NATCONATCOSterling Structures$739,146.00Jul-201077% 
NATIONAL CITY MORTG.NATIONAL CITY MORTG.Fleetwood Masters Construction $20,444.00Oct-200582% 
NATIONAL CITY MORTGAGENATIONAL CITY MORTGAGEFleetwood Masters Construction $20,444.00Jul-200599% 
NE MEDICAL BOILER REPLACEMENTNE MEDICAL CENTERTOROAN ENTERPRISES$87,220.00Dec-200696% 
NE MEDICAL CHILLERNE MEDICAL CENTERSODEXHO$162,052.00Dec-200794% 
NE MEDICAL COOLING TOWER REPLACEMENTNE MEDICAL CENTERTROJAN ENTERPRISES$190,588.00Nov-200697% 
NEEDVILLE SCHOOL RENONEEDVILLE ISDSterling Structures$52,396.00Dec-200779% 
NEW CANEY CONCESSION STANDNew Caney ISDCOLLIER CONSTRUCTION$10,281.00Dec-200555% 
NEW CANEY ELM #7New Caney ISDCOLLIER CONSTRUCTION$1,131,537.00May-200799% 
NEW REGIONAL PLANNINGNew Regional PlanningHigbie Ventures$108,086.00Jun-201388% 
NEW REGIONAL PLANNINGREN REGIONAL PLANNINGHigbie Ventures$103,165.00Aug-200895% 
NORTH HARRIS MONTGOMERY COMMUNITY COLLEGE COMPUTER ROOMNORTH HARRIS MONTGOMERY COMMUNITY COLLEGEC-AIR-S Mechanical $44,403.00Feb-2001100% 
NORTH HARRIS MONTGOMERY COMMUNITY COLLEGE TOMBALLNORTH HARRIS MONTGOMERY COMMUNITY COLLEGEC-AIR-S Mechanical $38,433.00Jun-2002100% 
NORTHEAST PUTPATIENT SURGERYNORTHEAST MEDICALBeck-Ford Construction$39,438.00Mar-1997100% 
Northern Air Duct Inst.M&I ElectricNorthern Construction$24,182.00Sep-201395% 
NORTHSIDE HEALTH CENTERCity of HoustonBeck-Ford Construction$527,875.00Jul-1997100% 
NORTHWEST CROSSING SURGERY CENTERDR. ROBERT BELLBeck-Ford Construction$180,317.00Feb-200483% 
NPS KOUNTZEIMSF-ACG- COOPERATIVE AGREEMENTS & GENERAL SERVICESLEETEX CONSTRUCTION$101,408.00Sep-200990% 
NW DOCTORS PLAZAMemorial Herman Hospital SysBeck-Ford Construction$660,782.00Jun-200887% 
ONE FANNIN CAFEONE FANNIN CAFELUNA BROTHERS$26,640.00May-201171% 
OSLIN NATIONOSLIN NATIONOSLIN NATION$83,835.00Oct-201286% 
OUR LADY OF FATIMA Zenith Construction$40,484.00   
OUTPA. WOMEN/CHILDRENSOUT PATIENT WOMENDS AND CHILDRENHUMPHREY$636,609.00Feb-200796% 
P&W ARCH. LEASE SPACEPHILO & WILKE ARCHITECTSMCCOY WORKPLACE SOLUTIONS$46,231.00Jul-200391% 
P.E.T. NETPET NET PHARMACEUTEICALSVaughn Construction$226,086.00Mar-200390% 
PALLADIUM SUITE 150PALLADIUM MANAGEMENTBeck-Ford Construction$35,686.00Jul-2007100% 
PALLETIZED TRUCKINGPALLETIZED TRUCKINGJERRY CARTER CORP$28,308.00Apr-1997100% 
PARK PLAZA DR MASSONDR. MASSONMILLENIUM$73,395.00Feb-201365% 
PEAKWOOD- PET SCANTenet Healthcare SystemsBeck-Ford Construction$21,000.00Mar-200382% 
PEARLAND URGENT CAREPearland HospitalTriton Construction$20,137.00Feb-200589% 
PEARLAND URGENT CAREPearland HospitalTriton Construction$20,137.00Jul-200589% 
PET SCAN KINGWOODPET SCANMJ HARRIS$60,119.00Nov-200696% 
PET SCAN OF SUGARLANDE+ HEALTHCARE SYSTEMSMJ HARRIS$99,808.00Sep-200599% 
PET SCAN OF SUGARLANDPET SCANMJHARRIS$100,208.00Oct-200555% 
PET SCAN OF WILLOWBROOKE+ HEALTH CARE SYSTEMSMJ HARRIS$65,288.00Dec-200576% 
PGS 10TH FLOORGILLETT PROPERTIESTHE MAXWELL COMPANY$20,735.00Feb-1998100% 
PGS 2ND FLOORGILLETT PROPERTIESTHE MAXWELL COMPANY$11,250.00Feb-1998100% 
PHYSICIANS SURGICENTERPHYSICIANS SURGRICAL CARE, INCJACK RAUS$82,779.00Sep-1998100% 
PINE MED - DR. PALAUHOUSTON CTR FOR INFECTIOUS DISEASEFORNEY CONSTRUCTION$51,719.00Sep-201075% 
PINEY POINT ASCPINEY POINT SURGERY CENTERBeck-Ford Construction$230,144.00Aug-201067% 
PIO CABINDA BUILDING 1DELTA ENGINEERINGDWD CONSTRUCTION$73,738.00Mar-200997% 
PIO CABINDA BUILDING 2DELTA ENGINEERINGDWD CONSTRUCTION$45,167.00Mar-200994% 
PLEASANTON OFFICE BLDGIndependent Oilfield ChemicalsQuad-Tex Construction$57,690.00Mar-201481% 
POINT SECURETANGLEWOOD MARKETING, LTD.B. Bell Builders$207,000.00Nov-200362% 
POLLO COMPEROPOLLO COMPEROHigbie Ventures$18,000.00Jul-201277% 
POSTAL CREDIT UNIONUNITED STATES POSTAL SERVICEHIGBIE ROTH CONSTRUCTION$31,000.00Oct-1997100% 
POSTAL CREDIT UNION REPLUNITED STATES POSTAL SERVICEHIGBIE ROTH CONSTRUCTION$20,003.00Oct-1997100% 
PRARIE VIEW MAY HALLPRARIE VIEW A&M UNIVERSITYQuad-Tex Construction$26,050.00Dec-200995% 
PREMIER SURGERY CENTERPREMIER SURGERY CENTERTriton Construction$191,485.00Apr-200697% 
PROS INTERIOR LVL 7 & 9PROS Revenue ManagementBalfour Beatty$45,208.00Nov-201445% 
PROS INTERIOR LVLS 9-10PROS INTERIORSpawGlass$166,744.00Apr-201346% 
PSC 316 GEORGIACITY OF DEERPARKHigbie Ventures$67,118.00Nov-200987% 
QWEST FLOOR REPAIR WORKQWESTHC Beck$12,420.00Oct-2001100% 
RAISING CANERAISING CANEMAPP$63,436.00Feb-201288% 
RAM ROBERT E LEEHISDRAM MECHANICAL$12,447.00Nov-2009100% 
RAMTEC- PSITRANSWESTERNCOLEMAN CONTRACTING$49,929.00Mar-1998100% 
REPIPE EDGEWOOD SBISpring Branch ISDWALTON ROOFING$51,483.00Sep-200387% 
REPUBLIC BEVERAGE COMP ROOMREPUBLIC BEVERAGECOMANCHE CONTRACTORS$39,893.00Apr-200633% 
RICE ABERCROMBIE 2ND FLOORRice UniversityC-AIR-S Mechanical $464,529.00Dec-199870% 
RICE ABERCROMBIE DRS G&SRice UniversityZenith Construction$239,909.00Mar-200869% 
RICE BAKER MASTER HOUSERice UniversitySouth Coast Construction$10,910.00Dec-201083% 
RICE BIO LAB AUD AHU-3Rice UniversityJONES MANAGEMENT$100,529.00Dec-200687% 
RICE BIOLOGY EF212 C-AIR-S Mechanical $14,828.00   
RICE BIOLOGY RPL F 19&25Rice UniversityC-AIR-S Mechanical $27,740.00Oct-201194% 
RICE CHILD CARE CENTERRice UniversityCBIC CONSTRUCTION$145,606.00May-200980% 
RICE CHILLED WATERRice UniversityC-AIR-S Mechanical $30,950.00Oct-2001100% 
Rice Cohen House Inst RmRice UniversityB. Bell Builders$26,455.00Sep-201451% 
RICE COX AHU REPLACEMENTRice UniversityC-AIR-S Mechanical$111,187.00Jun-201383% 
RICE CP EXHAUST FANSRice UniversityC-AIR-S Mechanical $29,151.00Apr-200534% 
RICE DEL BTCHR HEX REPLCRice UniversityC-AIR-S Mechanical $17,989.00Feb-2010100% 
RICE DR LI LABRice UniversityZenith Construction$13,382.00Oct-200697% 
RICE DR. MOROSAN SPACE CENTERRice UniversityCBIC CONSTRUCTION$58,964.00Feb-200969% 
RICE Dr. Putnam LabRice UniversitySouth Coast Construction$97,240.00Dec-200961% 
RICE DR. RUDOLFRice UniversityZenith Construction$21,810.00May-200891% 
RICE DRS. QUELLER & STRAUSESRice UniversityZenith Construction$162,775.00May-200851% 
RICE FIRE WALL UP GRADESRice UniversityZenith Construction$20,029.00Nov-201094% 
RICE GATE & PLUG VLV REPLACEMENTRice UniversityC-AIR-S Mechanical $19,371.00Jun-200798% 
RICE GRB DR. CARSON LABRice UniversityB. Bell Builders$28,230.00Apr-201097% 
RICE GRB LAB FIR INSPECTIONRice UniversityC-AIR-S Mechanical $10,446.00Mar-200773% 
RICE GREENBRIAR BUILDINGRice UniversityC-AIR-S Mechanical$210,263.00Nov-201433% 
RICE HANSEN COLLEGERice UniversitySPAWMAXWELL$26,838.00Oct-200580% 
RICE HANSZEN COLLEGERice UniversitySPAWMAXWELL$26,838.00Nov-200495% 
RICE HANSZEN MASTER HOUSRice UniversityB. Bell Builders$31,779.00Aug-201177% 
RICE HANZEN COMM PRKRMRice UniversityB. Bell Builders$13,588.00Jun-201426% 
RICE HERTZSTEIN AHU REPLRice UniversityC-AIR-S Mechanical$72,756.00Oct-201370% 
RICE INTERIOR ALTER GRBRice UniversityB. Bell Builders$19,700.00Apr-201080% 
RICE KITCHEN COILRice UniversityC-AIR-S Mechanical $18,411.00Jun-201190% 
RICE Lovett Hall AHU RepRice UniversityC-AIR-S Mechanical $174,867.00Dec-200977% 
RICE MC NAIR JONES MANAGERice UniversityZenith Construction$57,853.00Sep-200699% 
RICE MCNAIR HALL 2, 3 &4Rice UniversityZenith Construction$57,794.00Oct-200860% 
RICE MCNAIR SUMMER WORKRice UniversityB. Bell Builders$44,262.00Feb-201359% 
RICE MEB AHU 2-2Rice UniversityC-AIR-S Mechanical $84,478.00Sep-200868% 
RICE MEB BUILDINGRice University3D INTERNATIONAL$1,010,426.00Mar-200968% 
RICE MEB PECVDRice University3D INTERNATIONAL$33,712.00Jun-2009100% 
RICE MECH LABRice UniversityC-AIR-S Mechanical$145,694.00Sep-201334% 
RICE MSNE RENOVATIONRice UniversityB. Bell Builders$26,854.00Dec-201462% 
RICE MUDD BUILDINGRice UniversityC-AIR-S Mechanical $86,177.00Apr-1999100% 
Rice President's House PipingRice UniversityC-AIR-S Mechanical$12,798.00Mar-201497% 
RICE RICH HEALTHRice UniversityZenith Construction$14,565.00Dec-201183% 
RICE RINGE LAB 3228Rice UniversityB. Bell Builders$23,590.00Dec-201458% 
RICE RYON ENGINEERINGRice University3D INTERNATIONAL$856,759.00Apr-200865% 
RICE SEWELL HALL RTY ADDRice UniversityC-AIR-S Mechanical $32,775.00Apr-200468% 
RICE SPACE SCI STROBICRice UniversityC-AIR-S Mechanical $85,900.00Feb-201186% 
RICE TUDOR MOBRice UniversityZenith Construction$33,118.00Jun-201379% 
RICE UNIVERSITY ANDERSON HALLRice UniversityC-AIR-S Mechanical $14,928.00Aug-1998100% 
RICE UNIVERSITY CHEMISTRY PREP ROOMRice UniversityDESAI CONSTRUCTION$42,425.00Mar-1998100% 
RICE UNIVERSITY CHW PUMP REPLACEMENTRice UniversityC-AIR-S Mechanical $16,180.00Nov-200354% 
RICE UNIVERSITY DR. LOU LABRice UniversityHarvey Builders$26,874.00Aug-200679% 
RICE UNIVERSITY GREENHOUSERice University3D INTERNATIONAL$285,714.00May-200799% 
RICE VARGAS LABRice UniversityB. Bell Builders$36,842.00Sep-201452% 
RICE VIVARIUM RENOVATIONRice UniversityZenith Construction$13,078.00Oct-2003100% 
RICE WILL MARSH DORM EXHRice UniversityZenith Construction$46,201.00Oct-200746% 
RICE-LOVETT COLLEGE PIMBRice UniversityLINCOLN BUILDERS$250,036.00Dec-201156% 
RICHMOND STATE SCHOOLSTATE OF TEXASSchneider Electric$32,412.00Feb-201363% 
RICHMOND STATE SCHOOL SOOLING TOWERSTATE OF TEXAS MHMRC-AIR-S Mechanical $162,078.00Aug-1999100% 
RIVER OAKS IMAGINGRIVER OAKS IMAGINGTHE MAXWELL COMPANY$57,482.00Sep-1998100% 
RIVER OAKS- MEMORIALRIVER OAKS IMAGINGSPAWMAXWELL$79,566.00Jan-200090% 
RIVER OAKS- WILLOWBROOKRIVER OAKS IMAGINGSPAWMAXWELL$160,895.00Jan-200030% 
ROBERT E. LEE HIGH SCHOOLHouston ISDC-AIR-S Mechanical $6,331,224.00Feb-200429% 
RYAN LANDSCAPINGRYAN LANDSCAPINGSPAWMAXWELL$11,085.00Oct-2000100% 
SACRED HEART RICHMONDSACRED HEARTZenith Construction$62,706.00May-200875% 
SAN JAC BOILER REPLACEMENTSan Jacinto College districtC-AIR-S Mechanical $326,048.00Nov-200580% 
SAN JAC CENTRAL PLANTSAN JACSAN JACINTO$2,239,154.00Dec-201064% 
SAN JACINTO COMMUNITY COLLEGE BOILERSan Jacinto College districtC-AIR-S Mechanical $35,913.00Feb-1997100% 
SAN JACINTO FAN COLISSan Jacinto College districtC-AIR-S Mechanical $24,716.00Dec-1999100% 
SAN JACINTO HVAC MODS DISTRICT ADMINSan Jacinto College districtC-AIR-S Mechanical $864,006.00Dec-200454% 
SAN JACINTO METHODIST HOSPITAL ICU RENOVATIONSThe Methodist HospitalSPAWMAXWELL$185,681.00Sep-200180% 
SAN JACINTO METHODIST SURGERY ADDITIONSAN JACINTO METHODIST HOSPITALTHE MAXWELL COMPANY$81,832.00Feb-1998100% 
SAN JACINTO NORTH NATATORIUMSan Jacinto College districtC-AIR-S Mechanical $12,304.00Aug-1999100% 
SAN JACINTO POLICE STATIONSan Jacinto College districtDT CONSTRUCTION$66,960.00Oct-200362% 
SAN JACINTO POLICE STATIONSan Jacinto College districtDT CONSTRUCTION$72,007.00Dec-200351% 
SAN JACINTO RIVER AUTHORITY WOODLANDS WASTEWATER TREATMENT PLANTCity of WoodlandsJ.J. CONTRACTING$50,523.00Sep-2000100% 
SAN JACINTO THERMAL STORAGESan Jacinto College districtC-AIR-S Mechanical $1,956,869.00Apr-2000100% 
SAN JACINTO TRAINERSSan Jacinto College districtC-AIR-S Mechanical $70,865.00Jul-2000100% 
SAVATION ARMY PASADENASALVATION ARMYGAMMA CONSTRUCTION$186,722.00Feb-1999100% 
SAWYER CRYSTALSAWYER CRYSTAL SYSTEMSDIAMOND CONSTRUCTION$119,269.00Apr-1997100% 
SB ISD REPIPE EDGEWOODSpring Branch ISDWALTON ROOFING$51,483.00Nov-200381% 
SBC- AIRLINE TOLL BREAKROOMSouth Western Bell Comm.HC Beck$20,212.00Dec-200340% 
SBC- BEAUMONT CHILLERSouth Western Bell Comm.HC Beck$207,472.00Aug-200490% 
SBC CAPITAL 7TH & 4THSouth Western Bell Comm.HC Beck$179,951.00Sep-200389% 
SBC- GREENWOOD CHILLERSouth Western Bell Comm.HC Beck$334,230.00Dec-200491% 
SBC- IDLEWOOD PHASE ISouth Western Bell Comm.HC Beck$148,020.00Nov-200576% 
SBC- NEPTUNESouth Western Bell Comm.HC Beck$27,540.00Nov-200386% 
SBC- OVERLAND CHILLERSouth Western Bell Comm.HC Beck$339,912.00Nov-200591% 
SBC PARKWEST CH PUMPSouth Western Bell Comm.HC Beck$23,555.00Mar-200590% 
SBC- PARKWEST CHILLERSouth Western Bell Comm.C-AIR-S Mechanical $68,342.00Oct-200353% 
SBC- SPLITSSouth Western Bell Comm.HC Beck$81,158.00Oct-200595% 
SBC- SUNSET PUMPSSouth Western Bell Comm.HC Beck$11,106.00Apr-200480% 
SBC WESLAYAN 6TH FLOORSouth Western Bell Comm.HC Beck$18,716.00Aug-200487% 
SBC-PINEHURSTSouth Western Bell Comm.HC Beck$252,909.00Dec-200491% 
SBISD CHILLER REPLACEMENTSpring Branch ISDC-AIR-S Mechanical $188,662.00Jun-200768% 
SBISD ELEMENTARY SCHOOLSSpring Branch ISDSterling Structures$501,557.00Feb-201053% 
SBISD STRATFORD CHILLER REPLACEMENTSpring Branch ISDC-AIR-S Mechanical $509,280.00Oct-200778% 
SCURLOCK ENDOSCOPYThe Methodist HospitalVaughn Construction$92,536.00Nov-1998100% 
SCURLOCK ENDOSCOPYThe Methodist HospitalSouth Coast Construction$173,518.00Feb-200571% 
SCURLOCK ENDOSCOPY EXPThe Methodist HospitalSouth Coast Construction$170,368.00Oct-200372% 
SEARCH BUILDINGS E A R C HU S MECHANICAL$12,643.00Mar-1998100% 
SELECT HEIGHTS 6TH FLOORSELECT SPECIALTY HOSPITALSELECT SPECIALTY HOSPITAL$36,564.00Nov-20103% 
SEQWRIGHT LIEBERTSeqwrightLCS Constructors$40,240.00Dec-201397% 
SGS OFFICESGSLCS Constructors$31,095.00Dec-201185% 
SGS PA REPAIR EXIST HVACSGSLSC Constructors$14,168.00Apr-201392% 
SGS PORT ARTHURSGSLCS Constructors$297,365.00Apr-201392% 
SHARPSTOWN CHILLER REPLACEMENTSHARPSTOWN GENERAL HOSPITALC-AIR-S Mechanical $161,924.00Apr-1997100% 
SHELDON CE KING HIGH SCHOOL RENOVATIONSSheldon ISDFROST CONSTRUCTORS$291,587.00Oct-200560% 
SHELDON ISD ROYALWOOD & MONAHANSheldon ISDC-AIR-S Mechanical $1,055,595.00Dec-2001100% 
SHENZI LIVING QUARTERSDELTA ENGINEERINGDWD CONSTRUCTION$147,440.00May-200951% 
SHOE SHOWHAROLD A. CLARKSterling Structures$36,848.00May-201173% 
SmackoverCross OilNorthern Air$24,950.00Jun-2014100% 
SOSOUTHWESTERN BELL TELEPHONE FAIRBANKS NEWSouth Western Bell Comm.HC Beck$163,621.00Nov-2001100% 
SOUTH EAST SURGERY CENTERSOUTH EAST SURGERYAMERICAN BUILDERS$27,157.00Dec-2002100% 
SOUTH EAST SURGERY CENTERSOUTH EAST SURGERYAMERICAN BUILDERS$27,157.00Dec-2002100% 
SOUTHWESTERN BELL PARKVIEWSouth Western Bell Comm.HC Beck$41,846.00May-200386% 
SOUTHWESTERN BELL TELEPHONE AIRLINESouth Western Bell Comm.HC Beck$43,620.00Oct-2001100% 
SOUTHWESTERN BELL TELEPHONE AIRLINESouth Western Bell Comm.HC Beck$53,580.00Nov-2001100% 
SOUTHWESTERN BELL TELEPHONE ALIEFSouth Western Bell Comm.HC Beck$52,040.00Oct-2001100% 
SOUTHWESTERN BELL TELEPHONE APOLLOSouth Western Bell Comm.HC Beck$72,621.00Jan-2002100% 
SOUTHWESTERN BELL TELEPHONE BARKER COSouth Western Bell Comm.HC Beck$44,700.00Jan-1999100% 
SOUTHWESTERN BELL TELEPHONE BARKER COSouth Western Bell Comm.HC Beck$44,700.00Apr-1999100% 
SOUTHWESTERN BELL TELEPHONE BLUERIDGESouth Western Bell Comm.HC Beck$125,954.00Apr-1999100% 
SOUTHWESTERN BELL TELEPHONE BLUERIDGE COSouth Western Bell Comm.HC Beck$20,854.00Sep-1999100% 
SOUTHWESTERN BELL TELEPHONE CAPITOL PHASE IIISouth Western Bell Comm.HC Beck$775,353.00Nov-2001100% 
SOUTHWESTERN BELL TELEPHONE CYPRESSSouth Western Bell Comm.HC Beck$10,717.00Oct-2000100% 
SOUTHWESTERN BELL TELEPHONE FAIRBANKS RENOVATIONSouth Western Bell Comm.HC Beck$720,971.00Dec-2001100% 
SOUTHWESTERN BELL TELEPHONE GALVESTONSouth Western Bell Comm.HC Beck$476,498.00Feb-2001100% 
SOUTHWESTERN BELL TELEPHONE GREENSPOINTSouth Western Bell Comm.HC Beck$319,453.00Feb-200396% 
SOUTHWESTERN BELL TELEPHONE HEMPSTEADSouth Western Bell Comm.HC Beck$17,819.00Dec-200275% 
SOUTHWESTERN BELL TELEPHONE HOLLISTERSouth Western Bell Comm.HC Beck$19,200.00Jun-1999100% 
SOUTHWESTERN BELL TELEPHONE HOLLISTER 2ND FLOORSouth Western Bell Comm.HC Beck$13,517.00Sep-2000100% 
SOUTHWESTERN BELL TELEPHONE HOMESTEAD AHUSouth Western Bell Comm.HC Beck$44,157.00Dec-200290% 
SOUTHWESTERN BELL TELEPHONE HOMESTEAD CHILLERSouth Western Bell Comm.HC Beck$321,478.00Sep-200290% 
SOUTHWESTERN BELL TELEPHONE IDLEWOOD GENERATORSouth Western Bell Comm.HC Beck$18,901.00Dec-2001100% 
SOUTHWESTERN BELL TELEPHONE JACKSONSouth Western Bell Comm.HC Beck$139,803.00Nov-2001100% 
SOUTHWESTERN BELL TELEPHONE JOHN RALSTON RETENTION WALLSouth Western Bell Comm.HC Beck$64,923.00Feb-2002100% 
SOUTHWESTERN BELL TELEPHONE KIRBYVILLE SOCSouth Western Bell Comm.HC Beck$11,878.00May-1999100% 
SOUTHWESTERN BELL TELEPHONE KLEINSouth Western Bell Comm.HC Beck$15,990.00Oct-2000100% 
SOUTHWESTERN BELL TELEPHONE KLEIN COSouth Western Bell Comm.HC Beck$15,799.00Jul-1999100% 
SOUTHWESTERN BELL TELEPHONE KNIGHT ROADSouth Western Bell Comm.HC Beck$32,292.00Jun-1999100% 
SOUTHWESTERN BELL TELEPHONE LAKE JACKSON GENERATORSouth Western Bell Comm.HC Beck$18,934.00Sep-200250% 
SOUTHWESTERN BELL TELEPHONE LAKE JACKSON NEWSouth Western Bell Comm.HC Beck$203,237.00Nov-200270% 
SOUTHWESTERN BELL TELEPHONE LAKE JACKSON REMODELSouth Western Bell Comm.HC Beck$120,578.00Oct-200298% 
SOUTHWESTERN BELL TELEPHONE LANGHAM COSouth Western Bell Comm.HC Beck$10,927.00Jul-1999100% 
SOUTHWESTERN BELL TELEPHONE MEDICAL CENTER CHILLERSouth Western Bell Comm.HC Beck$44,836.00Jul-1999100% 
SOUTHWESTERN BELL TELEPHONE MISSION ADA UPGRADESSouth Western Bell Comm.HC Beck$18,351.00Feb-20038% 
SOUTHWESTERN BELL TELEPHONE MOHAWK ADASouth Western Bell Comm.HC Beck$28,010.00Nov-200220% 
SOUTHWESTERN BELL TELEPHONE NACOGDOCHESSouth Western Bell Comm.HC Beck$47,542.00Dec-200280% 
SOUTHWESTERN BELL TELEPHONE NATIONAL AHUSouth Western Bell Comm.HC Beck$48,339.00Nov-2000100% 
SOUTHWESTERN BELL TELEPHONE ORCHARD AHUSouth Western Bell Comm.HC Beck$45,918.00Dec-200285% 
SOUTHWESTERN BELL TELEPHONE OXFORD AHUSouth Western Bell Comm.HC Beck$37,978.00Dec-200293% 
SOUTHWESTERN BELL TELEPHONE PASADENA GREENWOODSouth Western Bell Comm.HC Beck$105,800.00Jan-1999100% 
SOUTHWESTERN BELL TELEPHONE REPUBLICSouth Western Bell Comm.HC Beck$275,195.00Nov-2001100% 
SOUTHWESTERN BELL TELEPHONE ROSENBERGSouth Western Bell Comm.HC Beck$25,817.00Dec-200292% 
SOUTHWESTERN BELL TELEPHONE SATSUMA COSouth Western Bell Comm.HC Beck$20,627.00Aug-1999100% 
SOUTHWESTERN BELL TELEPHONE TOMBALLSouth Western Bell Comm.HC Beck$38,600.00Aug-200260% 
SOUTHWESTERN BELL TELEPHONE WARREN GENERATORSouth Western Bell Comm.TRI-MC ENTERPRISES$47,355.00Feb-200421% 
SOUTHWESTERN BELL TELEPHONE WESLAYANSouth Western Bell Comm.HC Beck$10,273.00Oct-2000100% 
SPAW GLASS EXPANSIONSPAW GLASSC-AIR-S Mechanical $12,100.00Jan-1999100% 
SPEC'S LOUETTASPECHigbie Ventures$78,850.00Feb-201085% 
SPRING HILL SUITESTHE MARRIOTDESIGN ELECTRIC$18,507.00Jul-200477% 
SPRING ISD LOCKER RENO Sterling Structures$86,000.00   
SPRING VALLEY EMERGENCYMANAGEMENT REHABILIATATIONBeck-Ford Construction$144,556.00Feb-201174% 
SPRINT POWERED WORKPLACESPRINTSUMMIT$55,181.00Oct-200754% 
SRB SQ TO RDMD Anderson Cancer CenterMD ANDERSON$11,274.00Nov-200260% 
ST JAMES CONDO BASEMENTST. JAMES COUNCIL OF CO-OWNERSZenith Construction$8,000.00Mar-200173% 
ST MAXIMILLIAN KOLBE CHURCHST MAXIMILLIAN KOLBE CHURCHFRETZ CONSTRUCTION$147,391.00Oct-1997100% 
ST REGIS SPORTS COMPLEXST REGISSterling Structures$455,510.00Oct-201366% 
ST REGIS WINE ROOMSTARWOOD HOTELSST REGIS HOTELS$11,617.00Jun-200696% 
ST THOMAS UNIVERSITY BUILDING 36, 37, 38THE UNIVERSITY OF ST. THOMASC-AIR-S Mechanical $19,179.00Sep-2001100% 
ST. CATHERINE CYSTO ROOMChristus St. Catherine HospitalTriton Construction$43,700.00Oct-200631% 
ST. CATHERINE SLEEP LABChristus St. Catherine HospitalTriton Construction$43,235.00Jun-200654% 
ST. JAMES CONDO BASEMENTST. JAMES COUNCIL OF CO-OWNERSZenith Construction$10,000.00Apr-2010100% 
ST. JOHNS ORChristus St. John HospitalTriton Construction$10,977.00Jul-200270% 
ST. JOSEPH ELEMST JOSEPH ELEMQuad-Tex Construction$168,190.00Mar-200979% 
ST. LUKES MARKETING OFFICEST. LUKES SPISCIPAL HOSPITALB. Bell Builders$12,694.00Jun-200755% 
ST. REGIS ELEVATOR PENTHOST HOTELS AND RESORTSST. REGIS HOUSTON$13,850.00Feb-200892% 
ST. REGIS HOTELST. REGISC-AIR-S Mechanical $184,980.00Sep-200624% 
ST. THOMAS AQUINASST. THOMAS AQUINASST. THOMAS$64,246.00Oct-201197% 
ST. THOMAS H.S. DAMPERSST. Thomas High SchoolVaughn Construction$45,840.00Jun-201398% 
STARBUCKS HUMBLE SHELLSTARBUCKSMARATHON$14,450.00Aug-200595% 
STARBUCKS NORTH PARKSTARBUCKSMARATHON BUILDERS$24,012.00Aug-2005100% 
STERLING BANK CHAMPIONSSTERLING BANKR HASSELL BUILDERS$39,900.00Mar-1997100% 
STERLING HIGH SCHOOLHouston ISDMULTI-D CONSTRUCTION$30,923.00Sep-1997100% 
STEWART CINCO RANCHSTEWART TITLERay Scaggs Construction Co$52,606.00Sep-200779% 
STEWART TITLE ADDITIONSTEWART TITLERay Scaggs Construction Co$10,765.00Sep-200686% 
STEWART TITLE FULSHEARSTEWART TITLERay Scaggs Construction Co$24,200.00Apr-200789% 
STEWART TITLE VILLAGE STSTEWART TITLERay Scaggs Construction Co$91,970.00Mar-200983% 
STEWART TOWN & COUNTRYSTEWART TITLERay Scaggs Construction Co$52,608.00Mar-200974% 
STRESS ENGINEERINGSTRESS ENGINEERINGC-AIR-S Mechanical $110,469.00Jul-1999100% 
SUGARLAND MAINTENANCE FACILITYCity of SugarlandSPEER INDUSTRIES$14,847.00Oct-1997100% 
SUPERCROWN BOOKS KINGWOODSUPERCROWN BOOKSHIGBIE ROTH CONSTRUCTION$41,188.00Apr-1997100% 
SUZANNE RON WINE ROOMSuzanne RonC-AIR-S Mechanical$14,940.00Nov-201498% 
SWBT- BEAUMONT TWINBROOKSouth Western Bell Comm.HC Beck$41,926.00Mar-200380% 
SWBT- DEER PARKSouth Western Bell Comm.HC Beck$48,251.00Nov-200451% 
SWBT FREEPORTSouth Western Bell Comm.HC Beck$169,321.00Aug-200388% 
SWBT GALVESTON SHERWOODSouth Western Bell Comm.HC Beck$40,693.00Jan-200590% 
SWBT GARWOODSouth Western Bell Comm.HC Beck$48,998.00Aug-200599% 
SWBT- GARWOOD CHILLERSouth Western Bell Comm.HC Beck$48,998.00Dec-200588% 
SWBT JACKSON 1ST FLOORSouth Western Bell Comm.HC Beck$14,658.00Aug-200577% 
SWBT MISSION ADA UPGRADESouth Western Bell Comm.HC Beck$18,351.00Feb-20038% 
SWBT MISSION AHUSouth Western Bell Comm.SOUTH WESTERN BELL TELEPHONE$35,623.00Sep-200571% 
SWBT MUSTANG RDSouth Western Bell Comm.IDC$11,746.00Sep-200596% 
SWBT NATIONAL AHU REPAIRSouth Western Bell Comm.HC Beck$15,589.00May-2003100% 
SWBT OLD KATYSouth Western Bell Comm.HC Beck$27,233.00May-200699% 
SWBT- OVERLAND CHILLERBECKHC Beck$339,912.00Oct-200595% 
SWBT OVERLAND CLEANINGSouth Western Bell Comm.SOUTH WESTERN BELL TELEPHONE CORP$10,395.00Jul-2005  
SWBT- PARKVIEWSouth Western Bell Comm.HC Beck$41,846.00May-200386% 
SWBT- PARKVIEW CHILLERSouth Western Bell Comm.HC Beck$85,702.00Mar-200685% 
SWBT PARKWEST BOILERSouth Western Bell Comm.HC Beck$43,338.00Aug-200584% 
SWBT- PARKWEST CH PUMSouth Western Bell Comm.HC BECK$25,997.00Dec-200572% 
SWBT PARKWEST FIRESouth Western Bell Comm.HC Beck$45,409.00Oct-200591% 
SWBT PARKWEST GENERATORSouth Western Bell Comm.HC Beck$52,083.00Dec-200599% 
SWBT- PARKWEST GENERATORSouth Western Bell Comm.HC Beck$55,440.00Dec-200599% 
SWBT PARKWEST INTERNETSouth Western Bell Comm.HC Beck$28,696.00Feb-2007100% 
SWBT PARKWEST JOCKEYSouth Western Bell Comm.SBC PARKWEST$11,879.00Oct-200570% 
SWBT PARKWEST PH3South Western Bell Comm.HC BECK$250,041.00Feb-200797% 
SWBT PARKWEST PH4South Western Bell Comm.HC BECK$17,741.00Sep-200698% 
SWBT PORT ARTHURSouth Western Bell Comm.HC Beck$14,849.00Mar-200389% 
SWBT PREDISIO 2ND FLOORSouth Western Bell Comm.HC BECK$14,835.00Dec-2006100% 
SWBT- PRESIDIO CONTROLSSouth Western Bell Comm.ENCO S$59,011.00Dec-200599% 
SWBT- PRESIDIO SPLITSouth Western Bell Comm.HC Beck$12,456.00Nov-200392% 
SWBT ROSENBERGSouth Western Bell Comm.HC Beck$39,599.00Aug-200550% 
SWBT ROSENBURG TRIMICSouth Western Bell Comm.HC Beck$31,728.00Dec-200514% 
SWBT STATSUMASouth Western Bell Comm.HC Beck$319,964.00Dec-200390% 
SWBT SUNSET CHILLERSouth Western Bell Comm.HC Beck$610,530.00Jan-200493% 
SWBT TEXAS CITYSouth Western Bell Comm.HC BECK$23,396.00Aug-200699% 
SWBT TOMBALLSouth Western Bell Comm.HC Beck$302,657.00Dec-200586% 
SWBT WESLAYAN 6TH FLOORSouth Western Bell Comm.HC Beck$165,257.00May-200371% 
SWBT WESLAYAN CHILLERSouth Western Bell Comm.HC BECK$1,008,524.00Feb-200790% 
SWBT WESLAYAN CHILLERSouth Western Bell Comm.HC Beck$1,072,597.00Oct-200791% 
SWBT-CLAY CHILLERSouth Western Bell Comm.HC BECK$173,117.00Mar-200789% 
SWBT-MADISONVILLESouth Western Bell Comm.HC Beck$20,997.00Oct-200592% 
SWBT-OLD KATY ROADSouth Western Bell Comm.HC BECK$113,397.00May-200677% 
SWBT-PARKWEST PHASE 2South Western Bell Comm.HC BECK$22,236.00Jul-200699% 
SWIFT ENGERYSWIFT ENGERYEvolve Infrastructure$162,618.00Jul-200975% 
TAM INTERNATIONALTAM INTERNATIONALPORGUE CONSTRUCTION$376,010.00Dec-2001100% 
TAM INTERNATIONAL ADDTAM INTERNATIONAL ADDTAM INTERNATIONAL$52,853.00Dec-201084% 
TAMU 1st FLOOR INTERDISCIPLTexas A&M UniversityQuad-Tex Construction$139,620.00Dec-201042% 
TAMU 3RD FLOOR LABTexas A&M UniversityQuad-Tex Construction$246,479.00Feb-201150% 
TAMU ASS. FORMER STUDENTSTexas A&M UniversityQuad-Tex Construction$300,263.00Nov-200988% 
TAMU BLDG 454Texas A&M UniversityQuad-Tex Construction$21,558.00Oct-201391% 
TAMU BLOCKER 1,2, 6Texas A&M UniversityQuad-Tex Construction$11,394.00Sep-201455% 
TAMU BMS TELECOMMUNICATE Quad-Tex Construction$17,230.00   
TAMU BRAYTON FIRE TRAINTexas A&M UniversityQuad-Tex Construction$218,133.00Jun-201366% 
TAMU BSBWTexas A&M UniversityQuad-Tex Construction$38,782.00May-200799% 
TAMU Caged AnimalTexas A&M UniversityQuad-Tex Construction$27,396.00Mar-201485% 
TAMU CAIN HALL RENOVATETexas A&M UniversityQuad-Tex Construction$11,280.00Apr-201368% 
TAMU CATER MATIL DEMOTexas A&M UniversityQuad-Tex Construction$33,372.00Mar-201490% 
Tamu Cater Mattil RenoTexas A&M UniversityQuad-Tex Construction$1,049,228.00Nov-201452% 
TAMU CHANCELLOR'STexas A&M University $48,157.00Nov-201477% 
TAMU CLEMENTS HALL OAHUTexas A&M UniversityQuad-Tex Construction$166,310.00Dec-201261% 
TAMU DUNCAN HALLTexas A&M UniversityQuad-Tex Construction$70,642.00Jun-201054% 
TAMU DUNCAN HALLTexas A&M UniversityQuad-Tex Construction$454,107.00Sep-200695% 
TAMU EASTERWOOD BOILERTexas A&M UniversityTEXAS A&M UNIVERSITY SYSTEMS$57,990.00Mar-200795% 
TAMU ELLER BLD O&MTexas A&M UniversityQuad-Tex Construction$54,330.00Sep-200746% 
TAMU FOOD PROTEIN LAB RETexas A&M UniversityQuad-Tex Construction$59,300.00   
TAMU GREEN HOUSETexas A&M UniversityQuad-Tex Construction$15,392.00Nov-2014100% 
TAMU HAAS HALLTexas A&M UniversityQuad-Tex Construction$176,751.00Sep-200964% 
TAMU HALBOUTYTexas A&M UniversityQuad-Tex Construction$697,337.00Jul-200869% 
TAMU HAZARDOUS WASTexas A&M UniversityQuad-Tex Construction$29,453.00Sep-2008188% 
TAMU HENSEL IITexas A&M UniversityQuad-Tex Construction$312,660.00Nov-201464% 
TAMU HENSEL TOWERTexas A&M UniversityQuad-Tex Construction$179,443.00Jun-201080% 
TAMU HSCTexas A&M University $35,305.00Nov-201469% 
TAMU IODP RENOVATIONSTexas A&M UniversityQuad-Tex Construction$69,849.00Aug-200760% 
TAMU ISLB COLD RMTexas A&M UniversityQuad-Tex Construction$12,968.00Sep-201359% 
TAMU ISLB LAB 1195/1160Texas A&M UniversityQuad-Tex Construction$66,264.00Sep-201341% 
TAMU KLEBURG TEST KITTexas A&M UniversityLABMEC$22,352.00Feb-201288% 
TAMU KYLE FIELDTexas A&M UniversityQuad-Tex Construction$54,597.00Sep-200880% 
TAMU MCFADDEN HALLTexas A&M UniversityQuad-Tex Construction$130,125.00Aug-201046% 
TAMU MCKENZIE CHILLERTexas A&M UniversityTEXAS A&M UNIVERSITY$99,986.00Sep-200774% 
TAMU NUCLEAR TEST FACTexas A&M UniversityQuad-Tex Construction$368,664.00Apr-200731% 
TAMU O&M 12TH FLOORTexas A&M UniversityQuad-Tex Construction$50,544.00Aug-200874% 
TAMU ReynoldsTexas A&M UniversityQuad-Tex Construction$15,811.00Dec-201397% 
TAMU RIVERSIDE WAREHOUSETexas A&M UniversityQuad-Tex Construction$23,758.00Sep-2013100% 
TAMU RUDDER RESTROOMSTexas A&M UniversityQuad-Tex Construction$14,840.00May-201480% 
TAMU SCHOOL OF NURSINGTexas A&M UniversityTAMU$14,462.00Nov-200961% 
TAMU SUP 3Texas A&M UniversityQuad-Tex Construction$354,561.00Apr-201288% 
TAMU TURBO MACHINETexas A&M UniversityQuad-Tex Construction$79,751.00Sep-200858% 
TAMU WIND TUNNELTexas A&M UniversityQuad-Tex Construction$20,932.00Jun-2013100% 
TAMU ZACHRY BLDG. 518Texas A&M UniversityQuad-Tex Construction$26,792.00Apr-201369% 
TANG BASE SUPPLY/ BCETEXAS AIR NATIONAL GUARDC-AIR-S Mechanical $241,018.00May-2003100% 
TDCJ COFFIELDTEXAS DEPARTMENT OF CRIMINAL JUSTICEC-AIR-S Mechanical $200,000.00Dec-1999100% 
TDCJ ESTELLETEXAS DEPARTMENT OF CRIMINAL JUSTICEC-AIR-S Mechanical $163,500.00Mar-2001100% 
TDCJ SRMF CHILLERTEXAS DEPARTMENT OF CRIMINAL JUSTICEC-AIR-S Mechanical $370,044.00Sep-200170% 
TDJC RUSKTEXAS DEPARTMENT OF CRIMINAL JUSTICEC-AIR-S Mechanical $175,000.00Aug-1999100% 
TELE- CHECK 5TH FLOORTELE-CHECKHC Beck$96,056.00Oct-200293% 
TEXAS COMMERCE BANK 1717 TRAVISTEXAS COMMERCE BANKMETZGER CONSTRUCTION$81,500.00Dec-1997100% 
TEXAS COMMERCE BANK CONROETEXAS COMMERCE BANKMETZGER CONSTRUCTION$49,826.00Apr-1997100% 
TEXAS MEMORY - IBMOne Westchase Center TT LLCJones Lange LaSalle Americas$12,327.00Jun-201489% 
TEXAS MUNICIPAL POWERSTATE OF TEXASEvolve Infrastructure$18,574.00Mar-200930% 
TEXAS PETROCHEMICALTEXAS PETROCHEMICALLCS Constructors$1,603,208.00Apr-201264% 
THE BINZ BUILDINGBINZThe Binz Building$346,268.00   
THE HAND CENTERDOCTOR BROWNMETRO-STAR CONSTRUCTION$224,105.00Dec-200570% 
THE HOBBY CENTER General Air$329,012.00   
THE PALLADIUM FOR SURGERYDONALD KRAMER FAMILY, LTDBeck-Ford Construction$258,769.00Mar-200485% 
THE WOMEN'S HOSPITAL NURSINGColumbia Healthcare SystemsBeck-Ford Construction$28,047.00Feb-1997100% 
TIETAK CHILLER REPL.TIETAKC-AIR-S Mechanical $67,834.00Jul-200399% 
TIETEK MARSHALLTIETEKC-AIR-S Mechanical $83,655.00Mar-2004100% 
TMC 2151 HOLCOMBETEXAS MEDICAL CENTERMCDONALD ELECTRIC$10,937.00Sep-200432% 
TMC COMMUNICATIONTEXAS MEDICAL CENTERB. Bell Builders$165,628.00Jan-2007100% 
TMC GARAGE 4 PLUMBINGTEXAS MEDICAL CENTERC-AIR-S Mechanical $17,250.00Aug-200698% 
TMC HUMAN PERFORMANCETEXAS MEDICAL CENTERB. Bell Builders$95,518.00Apr-200771% 
TMH MAIN 1,2 & 6 EXHAUSTThe Methodist HospitalVaughn Construction$86,131.00Mar-201492% 
TMH 11TH FLOOR DAS ROOMThe Methodist HospitalDPR Construction$30,008.00Apr-201286% 
TMH 2 NEW ORS BUILDOUTSThe Methodist HospitalVaughn Construction$81,623.00Feb-2011100% 
TMH 2 NEW ORS BUILDOUTSThe Methodist HospitalVaughn Construction$81,623.00May-201175% 
TMH AHU REPLACE PH1The Methodist HospitalSpawGlass$1,202,178.00Apr-201158% 
TMH AHU REPLACE PH1The Methodist HospitalSpawGlass$1,202,178.00Apr-201188% 
TMH AHU YELLOW UNITSThe Methodist HospitalSpawGlass$615,593.00Sep-201287% 
TMH ALKEK HEAT EXCHANGERThe Methodist HospitalSpawGlass$135,511.00Sep-201481% 
TMH ANNEX ROOF-HVACThe Methodist HospitalSpawGlass$15,141.00Sep-201468% 
TMH ANNEX VISTING NURSEThe Methodist HospitalThe Trevino Group$2,230.00Oct-2005  
TMH B5 IT SERVER ROOMThe Methodist HospitalDPR Construction$33,804.00Dec-201169% 
TMH B5 OAHU REPLACEMENTThe Methodist HospitalSpawGlass$425,626.00May-201490% 
TMH CENTERFIELD PH 1 HRThe Methodist HospitalSouth Coast Construction$13,697.00Oct-201236% 
TMH CENTERFIELD PH2 SCThe Methodist HospitalSouth Coast Construction$32,377.00Oct-201215% 
TMH COLON AND RECTALThe Methodist HospitalThe Trevino Group$20,989.00Jul-200699% 
TMH- DR. CONLONDR. CONLONSouth Coast Construction$12,962.00Oct-200558% 
TMH DUNN CTThe Methodist HospitalSPAW GLASS$69,928.00Feb-201179% 
TMH DUNN TRASH CHUTEThe Methodist HospitalSpawGlass$73,646.00Apr-201484% 
TMH F13-04The Methodist HospitalSpawGlass$68,510.00Dec-201281% 
TMH GAS CYL STOR #78The Methodist HospitalVaughn Construction$49,563.00Jul-201090% 
TMH HARGRAVE WOUND CAREThe Methodist HospitalSouth Coast Construction$100,276.00Dec-201160% 
TMH HYBRID OR #101The Methodist HospitalVaughn Construction$329,682.00Dec-201056% 
TMH IMAG. UT AHU 27The Methodist HospitalSpawGlass$168,615.00Apr-2014  
TMH KATY DR. WHEELERThe Methodist HospitalSouth Coast Construction$24,183.00Aug-201155% 
TMH LIFE SAFETY LVL3The Methodist HospitalSPAW GLASS$90,254.00Aug-201075% 
TMH MAIN 1 TRIAGEThe Methodist HospitalThe Trevino Group$24,663.00Feb-200752% 
TMH MAIN 2 ANT PATHOLTREVINOThe Trevino Group$38,417.00Oct-200599% 
TMH MBI EXHAUSTThe Methodist HospitalSpawGlass$53,041.00Sep-201199% 
TMH NEURO 6 HUMIDIFIERThe Methodist HospitalSpawGlass$14,238.00Mar-201490% 
TMH PHARMACY CLEAN RM REPThe Methodist HospitalSpawGlass$42,904.00Oct-200919% 
TMH PREMIRE ONCOLOGYThe Methodist HospitalSouth Coast Construction$29,867.00Aug-201152% 
TMH RECON SURGERY 2200The Methodist HospitalMAHACA CONSTRUCTION$90,066.00Sep-200959% 
TMH RIB LEVEL 5 HYBRIDThe Methodist HospitalVaughn Construction$127,145.00Mar-201449% 
TMH SAN JAC ER/PAT/LABThe Methodist HospitalVaughn Construction$210,782.00Jun-200849% 
TMH SAN JAC WOMENS CENThe Methodist HospitalDELK CONSTRUCTION$198,705.00Dec-200862% 
TMH SCURLOCK PHARMACYThe Methodist HospitalSouth Coast Construction$23,988.00Feb-200967% 
TMH SCURLOCK RR RENOVATIONThe Methodist HospitalThe Trevino Group$13,000.00Aug-200755% 
TMH SJ C.T. REPLACEMENTThe Methodist HospitalSPAWMAXWELL$41,579.00Apr-201170% 
TMH SJ C.T. REPLACEMENTThe Methodist HospitalSPAWMAXWELL$41,579.00Jun-201150% 
TMH SJ C.T. RFP-5The Methodist HospitalSPAW MAXWELL$14,700.00Nov-201048% 
TMH SJ CARDIAC REHABThe Methodist HospitalSPAWMAXWELL$58,093.00Sep-201049% 
TMH SJ EP CATHETERIZATIONThe Methodist HospitalSPAW MAXWELL$55,900.00Nov-201046% 
TMH SJ UPS INTERGRATINGThe Methodist HospitalDELK$21,124.00Feb-201254% 
TMH SL DR. BINDALLThe Methodist HospitalSouth Coast Construction$22,529.00Nov-200947% 
TMH SL DR. DESAIThe Methodist HospitalSouth Coast Construction$41,672.00Apr-201253% 
TMH SL DR. REINOSOThe Methodist HospitalSouth Coast Construction$22,268.00Nov-200943% 
TMH SL NEURLOGYThe Methodist HospitalSouth Coast Construction$11,332.00Dec-201150% 
TMH SMITH F/D INSPECTIONThe Methodist HospitalTHE METHODIST HOSPITAL$24,216.00Dec-200770% 
TMH WB ENDOSCOPYMD Anderson Cancer CenterGentech Construction$153,810.00Apr-201354% 
TMH WB III DR AAAThe Methodist HospitalSouth Coast Construction$23,834.00Aug-201165% 
TMH WB MOB ADV ORTHOThe Methodist HospitalSouth Coast Construction$25,200.00Jun-201055% 
TMH WB STARBUCKSThe Methodist HospitalGentech Construction$23,811.00Nov-201428% 
TMH WH ATTIC STOCKThe Methodist HospitalSouth Coast Construction$57,588.00Apr-201199% 
TMH WH ATTIC STOCKThe Methodist HospitalSouth Coast Construction$57,588.00May-201199% 
TMH WH TRANSPLANTThe Methodist HospitalSouth Coast Construction$46,250.00Aug-201153% 
TMH WILLOWBROOK BLOOD BANKThe Methodist HospitalSPAWMAXWELL$32,141.00Dec-200369% 
TMH-SL DR JADAV #520The Methodist HospitalSouth Coast Construction$19,391.00Dec-201148% 
TOMBALL DATA CENTERTOMBALL DATA CENTEREvolve Infrastructure$12,360.00Mar-200967% 
TOMBALL FIRE 7 POLICE STATIONSCity of TomballBELMONT CONSTRUCTORS$117,063.00Jan-1997100% 
TOMBALL ISD ADMIN BLDG.Tomball ISDSterling Structures$656,088.00Nov-201286% 
TOMBALL ISD REP TO BECKENDORFTomball ISDSterling Structures$50,500.00Oct-200532% 
TOMBALL MISCELLANEOUS 2002Tomball ISDSterling Structures$1,951,803.00Aug-200346% 
TOMMY'SFOTEH BROTHERSC-AIR-S Mechanical $37,319.00Jul-1998100% 
TONY ROMA'STONY ROMA'SQuad-Tex Construction$143,577.00Dec-201172% 
Total PetrochemicalTotal PetrochemicalZenith Construction$50,489.00Apr-201381% 
TRANSTAR HVAC UPGRADES Accuvent$30,742.00   
TRI-C RESOURCES TRI-C REALTY$103,239.00   
TRINITY MEDICAL CENTERTRINITY MEDICAL CENTERWESTFALL CONSTRUCTORS$1,524,850.00Nov-200687% 
TRIUMPH HOSP NORTH ENTRATriumph HospitalBeck-Ford Construction$19,501.00Nov-200893% 
TRIUMPH HOSPITAL SW-PHS 4Triumph HospitalBeck-Ford Construction$236,990.00Nov-200864% 
TRIUMPH MED SUITE 205Triumph HospitalSPAW MAXWELL$24,516.00Jun-200883% 
TURNING POINT CENTERTURNING POINT MISSIONTURNING POINT MISSION$3,575.00Jul-200997% 
TWELVE OAKS LEVEL 2Twelve Oaks HospitalMILLENIUM$252,821.00Oct-200557% 
TWELVE OAKS TOWERTenet Healthcare SystemsMAXWELL CONSTRUCTION$398,687.00Jan-1999100% 
TX ORTHOEDIC PRE-ADTexas Orthopedic HospitalVaughn Construction$11,278.00Mar-200699% 
TX ORTHOPEDIC 23 HR JOBSTexas Orthopedic HospitalVaughn Construction$18,680.00Jul-200668% 
TX ORTHOPEDIC ADMIN EXPTEXAS ORTHOPEDIC HOSPITALVaughn Construction$182,018.00Feb-200957% 
TX ORTHOPEDIC PRE-ADTEXAS ORTHOPEDIC HOSPITALVENTURE MECHANICAL$11,278.00Dec-200580% 
U OF H DIESEL TEST LABUNIVERSITY OF HOUSTONVaughn Construction$1,421,098.00Dec-200975% 
U OF H GARRISON GYMUNIVERSITY OF HOUSTONLMC CORPORTATION$17,461.00Mar-200699% 
U OF H RES BLDG 1 RM 232UNIVERSITY OF HOUSTONVaughn Construction$22,823.00Jul-200652% 
U OF H S&R-1, RM 319UNIVERSITY OF HOUSTONWHALEN PLUMBING$25,386.00Jun-200784% 
UAL FLIGHT SIMULATOR CONTINENTAL AIRLINES$131,554.00   
UH DR TRAN GALV DUCTUNIVERSITY OF HOUSTONUHSVEC$14,785.00Oct-200578% 
UH DR TRAN SS EXH DUCTUNIVERSITY OF HOUSTONUNIVERSITY OF HOUSTON SVEC$29,652.00Oct-200590% 
UH Wotham ChillerThe University of HoustonThe Trevino Group$65,940.00Nov-201486% 
UNION PACIFIC- SPRINGUNION PACIFIC RAILROADCOLEMAN CONTRACTING$178,588.00Oct-200555% 
UNIVERSITY OF HOUSTON CHILLERUNIVERSITY OF HOUSTONC-AIR-S Mechanical $68,852.00Sep-2001100% 
UNIVERSITY OF HOUSTON CLEAR LAKE ARBORUNIVERSITY OF HOUSTONC-AIR-S Mechanical $40,463.00Feb-1998100% 
UNIVERSITY OF HOUSTON CLEAR LAKE LAB RENOVATIONUNIVERSITY OF HOUSTONFIREMEN CONSTRUCTION$302,397.00Jul-1999100% 
UNIVERSITY OF HOUSTON SR1-40 TON RTUUNIVERSITY OF HOUSTONC-AIR-S Mechanical $36,202.00Jul-1997100% 
UNIVERSITY OF TEXAS CENTER TOWER LEVEL 14The University of TexasVaughn Construction$243,087.00Nov-200298% 
UNIVERSITY OF TEXAS HEALTH SCHIENCE CENTER DENTAL VACUUM ROOMThe University of TexasC-AIR-S Mechanical $29,317.00Nov-2001100% 
UNIVERSITY WOMENS HEALTHMD Anderson Cancer CenterTEXTRON$83,082.00Feb-200798% 
UOFH AGNESS A COMP LABUNIVERSITY OF HOUSTONLMC CORPORATION$13,181.00Jan-200692% 
URBAN MEDIA SWITCH SYSTEMURBAN MEDIAWILSON BARNES$84,736.00Nov-2000100% 
URGENT CAREMemorial Herman Hospital SysFleetwood Masters Construction $11,947.00May-200683% 
US ISOLATION SWITCHMD Anderson Cancer CenterSouth Coast Construction$35,494.00Sep-200831% 
USPS LOCKER ROOM 401UNITED STATED POSTAL SERVICEThe Trevino Group$88,580.00Oct-1999100% 
UT HEALTH SCIENCE CENTER PCCLThe University of TexasThe Trevino Group$248,427.00Oct-200856% 
UT IMAGING CENTERUniversity of Texas Health Science CenterVaughn Construction$222,575.00Nov-200377% 
UTHSC HCPC DEMOUniversity of Texas Health Science CenterCBIC CONSTRUCTION$21,699.00Mar-201074% 
UTHSC IMM PIPINGUniversity of Texas Health Science CenterThe Trevino Group$20,080.00Sep-200970% 
UTHSC TEMPORARY CAGE WASHMD Anderson Cancer CenterVaughn Construction$80,550.00Oct-200256% 
UTHSCMSB HYDRO WALLUniversity of Texas Health Science CenterVaughn Construction$30,922.00Dec-200459% 
UTHSC-MSB-PRV STATIONUniversity of Texas Health Science CenterUNIVERSITY OF TEXAS$76,322.00Feb-200890% 
UTMB JP MCGOVERN ACADEMYMD Anderson Cancer CenterVaughn Construction$25,360.00Mar-200982% 
UTMB JSAMD Anderson Cancer CenterMANHATTAN CONSTRUCTION$34,413.00Jun-201059% 
UTMB LIFE SAFETY BLDG 6&7MD Anderson Cancer CenterVaughn Construction$72,655.00May-200799% 
UTMB LIFE SAFETY BLDG 9-121MD Anderson Cancer CenterVaughn Construction$20,863.00Jul-200699% 
UTMB SERVER ROOM RTUUT Medical BranchC-AIR-S Mechanical $6,882.00Oct-201184% 
UTMB UHC M056UT Medical BranchVaughn Construction$485,920.00Jul-2012100% 
UTMB VICTORY LAKESUT Medical BranchMANHATTAN$4,039,772.00Feb-201180% 
UTMB WOMENS HEALTHUT Medical BranchTEXTRON$83,082.00Aug-200677% 
UTMDA HYDRO WALL COLUMN 6MD Anderson Cancer CenterVaughn Construction$31,783.00Nov-200454% 
UTMSB CYCLOTRON CONVERSIONUT Medical BranchVaughn Construction$74,064.00Sep-200466% 
VA BLDG 109 LABVeterans Administration HospitalThe Trevino Group$65,675.00Nov-201486% 
VA BUILDING 108 TOLIET ROOMVeterans Administration HospitalC-AIR-S Mechanical $12,500.00Nov-1998100% 
VA BUILDING 110 WEST WINGVeterans Administration HospitalC-AIR-S Mechanical $120,761.00Jul-1999100% 
VA CENTRAL PLANT EXPANSIONVeterans Administration HospitalC-AIR-S Mechanical $2,106,877.00Jan-200312% 
VA CON DIAGNOSTIC EYEVA CON DIAGNOSTIC EYEThe Trevino Group$1,025,522.00Apr-201267% 
VA LOADING DOCKVeterans Administration HospitalC-AIR-S Mechanical $17,285.00Jul-1998100% 
VA MEDICAL CENTER, CENTER WINGVeterans Administration HospitalG&Z CONTRACTING$115,297.00Nov-199990% 
VA MEDICAL GAS RELOCATIONVeterans Administration HospitalJOURNEY CONSTRUCTION$17,000.00Dec-1998100% 
VA PRIME CARE CLINICVeterans Administration HospitalThe Trevino Group$38,348.00May-201498% 
VA-SPD STERIS EQUIPMENTVA-SPD STERISThe Trevino Group$31,245.00May-201297% 
VAUGHN SATELITE OFFICEJ.T. VAUGHN CONSTRUCTIONVaughn Construction$65,973.00Feb-200484% 
VERIZON EAST FWY Higbie Ventures$30,068.00Dec-2014100% 
VETERANS ADMINISTRATION ROOM 108Veterans Administration HospitalTRIGON CONSTRUCTION$202,173.00Dec-1998100% 
WALGREENS 12015 CTIMBERSWALGREENSHigbie Ventures$89,000.00Jun-201078% 
WALGREENS- CHAMPIONSSHAMROCK VENTURESHigbie Ventures$82,153.00Dec-200495% 
WALGREENS KINGWOODSHAMROCK VENTURESHigbie Ventures$92,474.00Dec-200581% 
WALGREENS MAIN @ BUFFALOSHAMROCK VENTURESHigbie Ventures$83,224.00Oct-200582% 
WALGREENS MASON 01169SHAMROCK VENTURESHigbie Ventures$102,529.00Dec-200697% 
WALGREEN'S MISSOURI CITYSHAMROCK VENTURESHigbie Ventures$84,500.00Jun-200382% 
WALGREENS SHEPERD-FEAGANSHAMROCK VENTURESHigbie Ventures$88,130.00May-200692% 
WALGREENS- TURTLE CREEKSHAMROCK VENTURESHigbie Ventures$83,213.00Feb-200478% 
WALGREENS VICTORIA #07963SHAMROCK VENTURESHigbie Ventures$100,132.00Jun-200685% 
WALGREENS VICTORIA REWORKSHAMROCK VENTURESHigbie Ventures$15,825.00Feb-2007100% 
WALGREENS- WESTHEIMER & HWY. 6SHAMROCK VENTURESHigbie Ventures$80,613.00May-200481% 
WALKER @ MAIN GARAGEFUN COASTHARVEY BUILDERS$196,658.00Dec-200780% 
WALKER RESIDENCEWALKERWALKER$27,636.00Oct-200596% 
WALLER HIGH SCHOOLWaller Independent ISDDERRYBERRY CONSTRUCTION$312,622.00Jan-1999100% 
WALLER ISD FIELD STORE & SCHULTZEWaller Independent ISDTHE KEN GURRY CORPORATION$220,000.00Jan-2003100% 
WALLER SCHOOLSWaller Independent ISDWALLER$112,700.00Feb-2011100% 
WASHINGTON & LUVERKUHNWASHINGTON AND LUVERKUHNHigbie Ventures$49,144.00Feb-201089% 
WEEKLY YMCAYMCASPAWMAXWELL$519,459.00Dec-200363% 
WEISSER ENGINEERINGWEISSER ENGINEERINGSTRATA BUILD$62,220.00Oct-2000100% 
WELLS FARGO BANK GESSNERMETRO NATIONAL CORPORATIONR HASSELL BUILDERS$34,500.00Oct-1997100% 
WEST CONROE BAPTIST CHURCHWEST CONROE BAPTIST CHURCHDIAMOND CONSTRUCTION$182,000.00Dec-1997100% 
WEST UNIVERSITY PLACE BUILDINGCity of West UniversityGASKEY CONSTRUCTION$298,380.00Feb-1999100% 
WESTCHASE GABLES DEHUMIDWESTCHASEFOUNDERS$53,038.00May-200761% 
WG 11854 NASA RD 1WALGREENSHigbie Ventures$104,045.00Nov-200878% 
WHATABURGER #828WHATABURGER CORP.ATKINSON & ASSOCIATES BUILDERS$30,675.00Sep-200382% 
WHATABURGER #838 FRIENDSWOODWHATABURGER CORP.ATKINSON & ASSOCIATES BUILDERS$30,675.00Mar-200474% 
WILLOWBROOK SURGERY CENTERSURGISBeck-Ford Construction$358,334.00May-200775% 
WILLOWBROOK SURGERY CENTERSURGIS (METHODIST HOSPITAL SYSTEMS)Beck-Ford Construction$373,919.00May-200775% 
WIMBERLY EOCEvolve InfrastructureEvolve Infrastructure$162,427.00Aug-200847% 
WIMBERLY EOC LOBBYEvolve InfrastructureEvolve Infrastructure$47,856.00Sep-200847% 
WOMAN'S PLACE ESPERSONCOLUMBIA WOMAN'S HOSPITALBFJ Construction$35,194.00Jul-1997100% 
WOODLANDS FIRE & RESCUEWOODLANDS FIRE DEPARTMENTALLIANCE CONSTRUCTION$24,500.00Feb-1997100% 
WYMAN-GORDON CYCLONE REPLACEMENTWYMAN- GORDONC-AIR-S Mechanical $44,886.00Nov-1998100% 
WYMON GORDON MIST COLLECTORWYMON GORDONC-AIR-S Mechanical $32,021.00Jan-2001100% 
YMCA CYPRESSWOODYMCACUSTOM MECHIANICAL$19,423.00Jun-200896% 
YMCA- GALVESTONYMCACUSTOM MECHANICAL$25,000.00Mar-200883% 
ZOO RESTROOM FACILITYHOUSTON ZOOVaughn Construction$17,174.00Feb-200894% 
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       