C-AIR-S Mechanical employees and helicopter. 06/12/09
C-AIR-S Mechanical employees and helicopter. 06/12/09
Rice University Lovett Temtrol Fan Wall retrofit AHU 07/13/09.
Rice University Lovett Hall AHU UV lights 08/06/09
Rice University Lovett Hall-Demo of existing AHU. 07/04/09
AT&T Weslayan-650 ton Trane CenTraVac. 07/21/06
AT&T Weslayan-Pumps and piping. 07/21/06
10) AT&T Weslayan-Pumps and piping. 07/21/06
11) AT&T Weslayan-350 ton Trane chiller. 07/21/06
12) AT&T Parkwest-350 ton Trane chiller. 2005
13) AT&T Sherwood-Temporary AC. 09/20/08
14) AT&T Sherwood-Temporary AC. 09/20/08
15) AirTex warehouse-setting fans with Pro-Lift. 08/12/09
Crossroads Baptist Church-Trane rooftops. August 2008. 04/23/08
Disaster City-Training facility for Texas A&M University fire Department. 04/11/2004
AT&T Fairbanks-Evaporcool system installed on Trane air cooled chillers. 06/17/10
San Jacinto College North-850 ton Trane chiller. 06/21/2010
San Jacinto College North-4,000,000 BTU Sellers boilers. 06/21/2010
UTMB Victory Lakes. 03/08/10
UTMB Victory Lakes-Temtrol AHU serving operating rooms. 06/11/09
UTMB Victory Lakes-typical floor duct. 06/11/09
UTMB Victory Lakes-Carrier 350 ton air cooled chillers. 06/22/10
UTMB Victory Lakes-Carrier 350 ton air cooled chillers. 06/22/10
28) Hunton Distribution-Trane Rooftops. 08/01/08
AT&T Parkwest-Chiller Yard. 06/23/10
AT&T Parkwest-Chiller Yard. 06/23/10
AT&T Parkwest-Trane 450 ton chillers. 06/23/10
MD Anderson Cancer Center-Tan building Strobic Fans. 08/02/06
MD Anderson Cancer Center-Tan building Strobic fans. 08/02/06
MD Anderson Cancer Center-Tan building Strobic fans. 08/02/06
MD Anderson steam to steam heat exchanger.05/25/06
MD Anderson steam to steam heat exchanger.05/25/06
MD Anderson 500 HP CHW Pump Replacement
MD Anderson Central 1CC1 AHU retrofit. 50,000 cfm AHU was gutted except for exterior skin. Insulation, new liner, supply and return fan wall, coils, dampers and filter racks were provided
MD Anderson Central 1CC1 AHU retrofit. 50,000 cfm AHU was gutted except for exterior skin. Insulation, new liner, supply and return fan wall, coils, dampers and filter racks were provided
MDA Bastrop. 06/05/09
MDA Basic Research Building Fan Wall AHU Installation.06/05/10
MDA Basic Research Building Fan Wall AHU Installation. Fan walls ready for installation.06/05/10
MDA Temporary Air for AHU Change-Out. 06/05/09 Old Clark Clinic
MDA Trane Custom AHU Assembly, Old Clark Clinic. 06/05/09
MDA Temporary Air for AHU Change-Out. 06/05/09
MDA Temporary Air for AHU Change-Out 06/05/09
University of Houston Diesel Lab
MD Anderson night crane lift setting AHUs into the basement of Old Clark Clinic. 08/10/07
MD Anderson Old Clark Clinic-Kitchen exhaust. 08/08/08
MD Anderson Old Clark Clinic-Kitchen and Dryer exhaust. 08/08/08
MD Anderson Bastrop Heavy Duty Canvas. 06/05/09
Tony Roma’s Bryan, Texas. 09/13/10
Tony Roma’s Bryan, Texas. 09/13/10
Tony Roma’s Bryan, Texas. 09/13/10
University of Houston Diesel Engine Test Facility. 06/01/09
University of Houston Diesel Engine Test Facility. 06/01/09
University of Houston Diesel Engine Test Facility. 07/10/09
University of Houston Diesel Engine Test Facility. 07/10/09
University of Houston Diesel Engine Test Facility. 07/28/09
University of Houston Diesel Engine Test Facility. 06/05/09
University of Houston Diesel Engine Test Facility. 09/22/09
University of Houston Diesel Engine Test Facility. 09/22/09
MD Anderson Clark Clinic Boiler Replacement. 09/13/10
Westbury Hospital. 11/24/08
COFH
COFH
MDA Field Assembled Fan Wall Air Handling Units, Lutheran Pavilion. 01/15/11
MDA Field Assembled Fan Wall Air Handling Units, Lutheran Pavilion. 01/15/11
MDA Field Assembled Fan Wall Air Handling Units, Lutheran Pavilion. 01/15/11
MDA Tan 2, Fan Wall Air Handling Units, 50,000 cfm. 08/12/10
MDA Tan 2, Fan Wall Air Handling Units, 50,000 cfm. 08/12/10
MDA Tan 2, Fan Wall Air Handling Units, 50,000 cfm. 08/22/10
Paul’s Jeep/Camper. 01/12/07
TPC Technical Center, Design Build. 04/13/11
TPC Technical Center, Design Build. 04/13/11
TPC Technical Center, Design Build. 04/13/11
TPC Technical Center, Design Build. 04/13/11
Hunton Distribution, LEED Bronze, 08/08/11
Houston Hobby Center, 650 ton hydraulic crane, 03/31/11
Houston Hobby Center, 24,000 cfm energy recovery unit, 03/31/11
TPC Tech Center June 2011
TPC Tech Center June 2011
C-AIR-S Tinman
12-18-2017